4. With the oscillating frame still mo-
ving and the recifier switched on and
preset and the air agitation switched on
you now fix the board over the galva-
nic plating bath.

Adjust correct current immediately
(without current you risk to etch off all
catalyst applied). Standard working
current setting is 3 A / dm². Example:
Board size 200 x 300mm = 6 dm², 3
A / dm² x 2 sides at 6 dm² = 3 x 2 x 6
= 36 A.

Every minute in the copper plating
bath will apply 0,7µm copper. Examp-
le: 18µm copper will be applied in 26
minutes of copper plating.

Adjust timer accordingly and leave
board in the plating bath as long as
necessary.

After that rinse carefully and dry the
board immediately to avoid oxidisati-
on.

Replenishment

Once your baths have been initially
made up, they can be easily replenis-
hed by simply adding the appropriate
product. See the instructions on the
following Plating System Step descrip-
tions. Missing replenishment will spoil

Bath maintenance

The Analysis procedures in the Plating
System Step descriptions are for expert
use only. This is to say the bathes
maintain stable and working also wit-
hout analyses, only by replenishment.
The Analysis procedures are given for
reference of expert users - who have
access to the appropriate measuring
devices.

For further information or help please
give us your fax or e-mail message
including your machine serial number
and detailed problem description. We
will help immediatly. Spare parts are
supplied with the understanding that
only qualified person will repair the
unit.

(C) 6/2002 Bungard Elektronik

Bungard Elektronik GmbH&Co KG· Rilke Str. 1 · D-51570 Windeck
Tel 02292 5036 · Fax 6175 · [email protected]

Compacta L30

Instructions for use

Plating line

Page 7

Содержание Compacta L30

Страница 1: ...2 Safety warnings In your own interest pay attention to all safety warnings on the unit and in the operating instructions Follow the instructions on operation and use of the unit in every respect 3 Ventilation Wherever you put the unit always en sure there is sufficient ventilation An exhaust system may be necessary de pending on your local requirements 4 Heat and moisture To prevent fire or the r...

Страница 2: ...ation in the appropriatesafety data sheets Do not allow chemicals to go into the drain The unit must not be used in the residential area keep away from child ren 9 Appliance check Close the drain valves before filling the tanks Use the machine only when all tanks are filled with liquid Other wise damage of the heating elements and tanks will happen immediately Control the liquid level daily The te...

Страница 3: ...n and can be heated up to 70 C The second hea ter can be used up to 50 C 3 Electroplating tank Approx internal dimensions 400 x 275 x 400 mm D x W x H capacity approx 30l Draining by means of an attached tap in the bottom The tank is equipped with an air bubble pipe for liquid agitation 4 Control section Two thermostates with switch one air pump 400 l h with switch main switch 5 el Timer Conveyor ...

Страница 4: ...T Room temp Bath 3 Activator Catalyst RT Bath 4 Salt remover 45 C Bath 5 Sparebath Bath 6 Electroplate RT 3 3 Check if the heater switch lamp turns off automatically at preset tem perature 4 Check again after 4 5 hours if not hing is leeking 5 Startair agitation for plating bath 6 Start mechanical agitation and vary agitation speed 7 If all steps of this test are passed without problems switch off...

Страница 5: ... that reason fix a clean and well brushed PCB of 200 x 300 mm in a board holder Then mount the holder onto the agitation rod and screw it carefully Start air agitation Start mechanical bath agitation Adjust agitation speed to about value 4 on the scale Activate rectifier and adjust a current of 1 A dm 2 sides x 6 dm x 1 A dm 12 A Run the bath accor ding to items 8 to 12 of the Plating System Step ...

Страница 6: ... Note al low 0 05 to 0 1mm extra diameter for the drill bits because copper plating in the holes will reduce the effective diameter After that use one of our brushing ma chines RBM series for scrub clean ing washing and drying if no bru shing machine available brush and clean manually 3 Fix the cleaned and deburred board in the COMPACTA 3 finger board holder and fix it on the leftmost con veyour a...

Страница 7: ...ey can be easily replenis hed by simply adding the appropriate product See the instructions on the following Plating System Step descrip tions Missing replenishment will spoil Bath maintenance The Analysis procedures in the Plating System Step descriptions arefor expert use only This is to say the bathes maintain stable and working also wit hout analyses only by replenishment The Analysis procedur...

Страница 8: ......

Страница 9: ......

Отзывы: