background image

Available spare parts

Thermostate, Heater 400W, drain val-
ve, board holder, set of anodes with
holder and bag, air pump, conveyor
motor, conveyor arm.

Technical data

Depth

930 mm

Width

880 mm

Height

1370 mm

Working height

950 mm

Weight approx

100 kg

Power

230 V 50 Hz 2000VA

Technical details subject to change wi-
thout notice

First test

To check that your plating line was not
damaged during transport we propose
to have an initial test run:

0. Close all outlet valves.

1. Fill all treatment tanks with 10 l and
the galvanic bath with 30 liters of wa-
ter.

2. If nothing is leeking switch the unit
on by means of the red main switch.

3. Check heating function:

3.1 The heater switch button is lighted.
Press heater button and adjust tempe-
rature:

3.2 Turn the thermostate knob to preset
the following temperatures from the
left to the right of the m/c

Bath #1: Cleaner Conditioner, 65 °C

Bath #2: Pre-dip, RT (=Room temp)

Bath #3: Activator (=Catalyst), RT

Bath #4: Salt remover, 45 °C

Bath #5: Spare bath,

Bath #6: Electroplate, RT

3.3 Check if the heater switch lamp
turns off automatically at preset tem-
perature.

4. Check again after 4-5 hours if not-

hing is leeking

5. Start air agitation for plating bath

6. Start mechanical agitation and vary
agitation speed

7. If all steps of this test are passed
without problems switch off all heaters
and the main switch. Empty all tanks,
clean with fuzzel free clothes and al-
low to dry overnight.

Chemicals Set-up

We supply Plating System chemicals
pre-mixed and ready for use. All ba-
thes should be filled up to about 20
mm under upper tank level. If that le-
vel should not be reached at any time
(e.g. due to evaporation) you can top
the Activator bath with ready made ca-
talyst solution - never with water - but
all other bathes with deionised water.
Refer to the Plating System Step docu-
mentation in the appendix for details.

Bungard Elektronik GmbH&Co KG· · Rilke Str. 1 · D-51570 Windeck
Tel 02292 5036 · Fax 6175 · [email protected]

Compacta L30

Instructions for use

Plating line

Page 4

Содержание Compacta L30

Страница 1: ...2 Safety warnings In your own interest pay attention to all safety warnings on the unit and in the operating instructions Follow the instructions on operation and use of the unit in every respect 3 Ventilation Wherever you put the unit always en sure there is sufficient ventilation An exhaust system may be necessary de pending on your local requirements 4 Heat and moisture To prevent fire or the r...

Страница 2: ...ation in the appropriatesafety data sheets Do not allow chemicals to go into the drain The unit must not be used in the residential area keep away from child ren 9 Appliance check Close the drain valves before filling the tanks Use the machine only when all tanks are filled with liquid Other wise damage of the heating elements and tanks will happen immediately Control the liquid level daily The te...

Страница 3: ...n and can be heated up to 70 C The second hea ter can be used up to 50 C 3 Electroplating tank Approx internal dimensions 400 x 275 x 400 mm D x W x H capacity approx 30l Draining by means of an attached tap in the bottom The tank is equipped with an air bubble pipe for liquid agitation 4 Control section Two thermostates with switch one air pump 400 l h with switch main switch 5 el Timer Conveyor ...

Страница 4: ...T Room temp Bath 3 Activator Catalyst RT Bath 4 Salt remover 45 C Bath 5 Sparebath Bath 6 Electroplate RT 3 3 Check if the heater switch lamp turns off automatically at preset tem perature 4 Check again after 4 5 hours if not hing is leeking 5 Startair agitation for plating bath 6 Start mechanical agitation and vary agitation speed 7 If all steps of this test are passed without problems switch off...

Страница 5: ... that reason fix a clean and well brushed PCB of 200 x 300 mm in a board holder Then mount the holder onto the agitation rod and screw it carefully Start air agitation Start mechanical bath agitation Adjust agitation speed to about value 4 on the scale Activate rectifier and adjust a current of 1 A dm 2 sides x 6 dm x 1 A dm 12 A Run the bath accor ding to items 8 to 12 of the Plating System Step ...

Страница 6: ... Note al low 0 05 to 0 1mm extra diameter for the drill bits because copper plating in the holes will reduce the effective diameter After that use one of our brushing ma chines RBM series for scrub clean ing washing and drying if no bru shing machine available brush and clean manually 3 Fix the cleaned and deburred board in the COMPACTA 3 finger board holder and fix it on the leftmost con veyour a...

Страница 7: ...ey can be easily replenis hed by simply adding the appropriate product See the instructions on the following Plating System Step descrip tions Missing replenishment will spoil Bath maintenance The Analysis procedures in the Plating System Step descriptions arefor expert use only This is to say the bathes maintain stable and working also wit hout analyses only by replenishment The Analysis procedur...

Страница 8: ......

Страница 9: ......

Отзывы: