Delivery
1-1
Chapter 1. Delivery
1.1 General
Recommendations
1.1.1 Delivery
Site preparation must be completed by the pre-arranged delivery date. Any delay due to
non-completion of the site by the pre-arranged date will be considered as the Customer’s
responsibility. See the
NovaScale Site Preparation Guide
86 A1 87EF.
The server cabinet is delivered 24 hours in advance of the scheduled installation date. On
arrival, the server cabinet must be placed, in its packing, in the Computer Room so that it
reaches the room temperature before powering up (optimum operating temperature = 22°
C
±3° C, hygrometry = 50% ±5%).
When the server drawer is delivered on its own, follow the procedure described in the
Appendix B.
CAUTION:
It is mandatory for the server cabinet to be transported vertically. The server cabinet is
extremely heavy and requires the use of an elevator. The Data Processing Site manager
must allocate enough personnel to ensure safe handling.
Содержание NovaScale 3005 Series
Страница 1: ...NovaScale 3005 Series Installation and User s Guide NOVASCALE REFERENCE 86 A1 02ET 05...
Страница 2: ......
Страница 18: ...xvi Bull NovaScale 3005 Series Installation and User s Guide...
Страница 23: ...Delivery 1 5 Figure 1 2 Location of Warning Labels on NovaScale 3025 3045 server rear...
Страница 54: ...2 30 NovaScale 3005 Series Installation and User s Guide...
Страница 78: ...A 4 Bull NovaScale 3005 Series Installation and User s Guide...
Страница 142: ...C 40 Bull NovaScale 3005 Series Installation and User s Guide...
Страница 157: ......
Страница 158: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE No 86 A1 02ET 05...