AGF-FE-1, AGF-FE-2
4 Installation and connection
4.1 Requirements to the installation site
The front plate has to be prepared according to the drawings in the data sheets.
The filter should be installed in a way so the filter element can be replaced. If the filter protrudes from a contour, please note
this poses a risk of damage.
The Maximum pressure is 2 bar (29 psi).
4.2 Connecting the gas lines
The connections must be made carefully and properly using suitable fittings.
Please check if your version has G-threads or NPT threads. On the latter, the item number on the nameplate is followed by "I".
An arrow on the filter indicates the flow direction.
The hoses are only slipped on and must be secured in the event of overpressure.
Perform a leak test with suitable means.
6
Bühler Technologies GmbH
BE410009 ◦ 04/2016
Содержание SCS 104
Страница 30: ...SCS 104 9 3 Drawing 1 Flow chart 28 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 32: ...SCS 104 9 5 Drawing 3 Front view 9 6 Drawing 4 Back view 30 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 34: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......