SCS 104
4 Installation and connection
4.1 Installation site requirements
The unit mounts in a 19 inch rack. Due to the weight the housing requires rails. These are available from the cabinet/rack manu-
facturer.
Please note, cooling generates waste heat inside the SCS. Adequate ventilation is therefore required (e.g. fan slot inside the cab-
inet).
The following requirements must be met during installation:
– Never install the system near sources of heat or vibration, in direct sunlight, or around high frequencies or magnetic fields.
The operator must install a lightning arrester.
– The system must be permanently installed in a location which can support the weight of the system.
– It must be protected from shock and impact.
– Never expose the display components to external forces.
– Never install the system outdoors.
4.2 Gas Line Connections
DANGER
Toxic, acidic gasses
Sample gas can be harmful.
a) The gas lines and electric cables must be connected by a professional. Observe local
laws and regulations.
b) If necessary, ensure a safe gas discharge.
c) Switch off the gas supply before performing maintenance and secure against acci-
dental opening.
d) Protect yourself from toxic/corrosive gases. Wear suitable protective equipment.
The gas connections are 1/4” bulkhead fittings. Ensure the connections are tight.
4.3 Electrical connections
WARNING
Hazardous electrical voltage
The device must be installed by trained staff only.
CAUTION
Wrong mains voltage
Wrong mains voltage may damage the device.
Regard the correct mains voltage as given on the type plate.
Use the included M3 plug to connect to power. The plug insert can be installed turned to your liking. Please refer to the wiring
diagram in the appendix for the assignment.
The supply line diameters must be aligned with the rated current. Use a maximum line cross-section of 1.5 mm
2
and a cable dia-
meter of 8 - 10 mm (0.31 – 0.39 inch).
CAUTION
Same Voltage
The voltage at the clamps for the status must always be the same. Do not mix different
voltages at the clamps.
All other signals connect with the included connector.
8
Bühler Technologies GmbH
BECS0031 ◦ 02/2020
Содержание SCS 104
Страница 30: ...SCS 104 9 3 Drawing 1 Flow chart 28 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 32: ...SCS 104 9 5 Drawing 3 Front view 9 6 Drawing 4 Back view 30 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 34: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......