Table of contents
Logano plus GB312 – 6 720 806 273 (2013/01)
2
Table of contents
1
General safety instructions and explanation of symbols . . . . 4
1.1
Key to symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.2
Safety considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2
Product information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1
Designated use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2
Standards, regulations and directives . . . . . . . . . . . . . . 5
2.2.1
National regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3
Compliance with standards and regulations . . . . . . . . . . 6
2.3.1
Massachusetts installations only: . . . . . . . . . . . . . . . . . . 6
2.4
Notes on installation and operation . . . . . . . . . . . . . . . . . 6
2.4.1
Other important information . . . . . . . . . . . . . . . . . . . . . . 6
2.5
Heating system water quality . . . . . . . . . . . . . . . . . . . . . . 7
2.6
Tools, materials and equipment . . . . . . . . . . . . . . . . . . . 7
2.7
Environmental Protection / Disposal . . . . . . . . . . . . . . . . 7
2.8
Product information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.9
Scope of delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.10
Dimensions and Specifications . . . . . . . . . . . . . . . . . . . 10
2.10.1 Logano plus GB312 dimensions . . . . . . . . . . . . . . . . . . 10
2.10.2 Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3
Transporting the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
3.1
Lifting and handling the boiler . . . . . . . . . . . . . . . . . . . . 13
3.2
Transporting the boiler on rollers . . . . . . . . . . . . . . . . . 14
4
Installing the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4.1
Installation room requirements . . . . . . . . . . . . . . . . . . . 14
4.2
Recommended wall clearances . . . . . . . . . . . . . . . . . . . 14
4.3
Leveling the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5
Openings for combustion air supply and venting . . . . . . . . . 15
6
Installing the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
6.1
Attaching the flue connector to the boiler . . . . . . . . . . . 17
6.2
Installing the flue system . . . . . . . . . . . . . . . . . . . . . . . . 18
6.3
Installing the wall penetration for a horizontal flue . . . . 18
6.4
Installation of the roof penetration of a vertical flue
systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
6.5
Connecting the air supply (for direct vent operations) 19
6.6
Installing the wall penetration for the air pipe . . . . . . . 20
6.7
Installing the roof penetration for the air pipe . . . . . . . 21
6.8
Design of flue and air pipe for direct vent operation . . 22
6.9
Connecting the heating system . . . . . . . . . . . . . . . . . . . 23
6.9.1
Safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6.9.2
Connecting the boiler to the heating system . . . . . . . . 24
6.9.3
Installing B-Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
6.9.4
Connecting the central heating supply . . . . . . . . . . . . . 25
6.9.5
Installing the heating system return . . . . . . . . . . . . . . . 25
6.9.6
Installing the DHW Tank . . . . . . . . . . . . . . . . . . . . . . . . . 25
6.9.7
Installing the condensate drain . . . . . . . . . . . . . . . . . . . 25
6.10
Filling heating system and checking for leaks . . . . . . . . 26
6.11
Providing the fuel supply . . . . . . . . . . . . . . . . . . . . . . . . 27
6.11.1 Installing gas feed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
6.11.2 Installation at high altitudes . . . . . . . . . . . . . . . . . . . . . . 28
6.12
Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . 29
6.12.1 Connecting the power supply . . . . . . . . . . . . . . . . . . . . 29
6.12.2 Leveling the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
7
Placing the heating system in operation . . . . . . . . . . . . . . . . 31
7.1
Checking heating system operating pressure . . . . . . . 31
7.2
Checking for leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
7.3
Checking appliance equipment . . . . . . . . . . . . . . . . . . . 32
7.4
Checking the air intake and outlet openings and flue
connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
7.5
Checking the air inlet diaphragm . . . . . . . . . . . . . . . . . . 33
7.6
Bleeding the gas supply pipe . . . . . . . . . . . . . . . . . . . . . 33
7.7
Making the heating system ready for operation . . . . . . 33
7.8
Commissioning the control unit and burner without
controller RC35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
7.9
Starting up the controls and burner with the RC35 user
interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
7.9.1
Boiler intended for operation with the
Logamatic 4000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
7.9.2
Boiler intended for operation with the RC35 . . . . . . . . 34
7.9.3
Continuing the commissioning procedure with the
RC35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
7.10
Switch on the boiler on the BC10 . . . . . . . . . . . . . . . . . 34
7.10.1 Conducting a flue gas test . . . . . . . . . . . . . . . . . . . . . . . 34
7.10.2 Opening the Service menu on the RC35 and viewing
monitor data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
7.11
Adjusting and checking CO2 level at maximum output 35
7.11.1 CO2 content, natural gas type A . . . . . . . . . . . . . . . . . . 35
7.12
Adjusting and checking CO2 level at minimum output . 35
7.12.1 CO2 content, natural gas type A (minimum output) . . 36
7.12.2 Reading off and comparing CO2 levels . . . . . . . . . . . . . 36
7.13
Checking and monitoring CO2 level at maximum
output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
7.14
Recording measured values . . . . . . . . . . . . . . . . . . . . . . 36
7.14.1 Switching the status display on the BC10 to show the
boiler temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
7.14.2 Returning to operating mode from the flue gas test . . . 36
7.14.3 Pressure differential . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
7.14.4 CO content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
7.15
Function testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
7.15.1 Checking the (flame) ionization current . . . . . . . . . . . . 37
7.16
Testing the gas supply pressure . . . . . . . . . . . . . . . . . . 37
7.17
Checking for leaks during operation . . . . . . . . . . . . . . . 38
7.18
Installing jacket panels . . . . . . . . . . . . . . . . . . . . . . . . . . 38
7.19
Inform owner/operator, hand over technical
documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
7.20
Commissioning report . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Содержание Logano plus GB312
Страница 93: ...Logano plus GB312 6 720 806 273 2013 01 93 Notes ...
Страница 94: ...Logano plus GB312 6 720 806 273 2013 01 94 Notes ...
Страница 95: ...Logano plus GB312 6 720 806 273 2013 01 95 Notes ...
Страница 96: ......