13
System inspection and maintenance
Logano G515 – 6 720 647 208 (2014/09)
44
Additional maintenance work as-needed
Page
Date:____________
Date:____________
1.
Shut down the heating system
38
2.
Remove and clean heat exchanger baffles
39
3.
Clean the flue gas passages (heating surfaces) and flue gas baffles
40
4.
Clean the combustion chamber
40
5.
Clean the draft diverter
40
6.
Insert the flue gas baffles
40
7.
Check gaskets/sealant ropes on the burner and burner door and replace if
required (see burner documentation)
8.
Commissioning the heating system
35
9.
Record the final checks of the maintenance work, incl. measurements and
test results
10.
Check safe and proper operation
Confirm professional inspection
Company stamp/signature
Company stamp/signature
Date:____________
Date:____________
Date:____________
Date:____________
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/signature
Company stamp/signature
Company stamp/signature
Company stamp/signature
Содержание Logano G515
Страница 66: ...Appendix Logano G515 6 720 647 208 2014 09 66 ...
Страница 67: ...Appendix Logano G515 6 720 647 208 2014 09 67 ...
Страница 68: ......