7
Boiler block assembly
Logano G515 – 6 720 647 208 (2014/09)
26
▶ Fit rectangular thermal insulation (
Fig. 44. [1]) with the cut-outs
facing upwards at the front above the door.
▶ Fasten thermal insulation to the block thermal insulation with the 3
spring hooks (
Fig. 44, [2]).
Fig. 44 Installing thermal insulation at the front
▶ Push longitudinal rails (
Fig. 45, [1 and 2]) with pre-fitted screws
into the notches in the brackets, as previously described, and screw
together.
Fig. 45 Installing the longitudinal rails
▶ Push back rear section thermal insulation (
Fig. 46, [1]) onto the
flue outlet. The cut-out for the boiler return (
Fig. 46, [2]) must
point upwards.
▶ Attach the thermal insulation for the rear section via the four spring
hooks to the boiler block thermal insulation.
▶ Close the slot below the flue outlet with a spring hook
(
Fig. 46, [3]).
Fig. 46 Fitting the thermal insulation for the rear section
▶ Hook each base rail (
Fig. 47, [1 and 3]) with the long projection
facing toward the front (
Fig. 47, [2]) into the bottom crosswise
profile rails.
▶ Initially screw the side of the base rails loosely to the crosswise
profile rails using self-tapping screws.
Fig. 47 Mounting the side base rails
6 720 642 623-42.1o
2
1
6 720 642 623-43.1o
2
1
6 720 642 623-44.1o
2
1
3
3
1
1
2
6 720 642 623-45.1o
1
2
3
Содержание Logano G515
Страница 66: ...Appendix Logano G515 6 720 647 208 2014 09 66 ...
Страница 67: ...Appendix Logano G515 6 720 647 208 2014 09 67 ...
Страница 68: ......