Büchi Labortechnik AG
Operation | 7
Operation Manual Sepiatec SFC-250
51/62
7
Operation
7.1
System start - up
u
Switch on the external thermostat. The
recommended temperature is 5 °C.
u
Switch on the chiller.
u
Push the
ON/OFF-switch
.
ð
This powers up the remaining
hardware.
u
Switch on the system with the
main
switch
.
ð
This also starts the computer and the
touchscreen.
u
Release the emergency switch button.
u
Press the green button next to the
emergency switch.
u
Tap the
[Prep SFC]
symbol on the
touchscreen to start the software.
ð
Prep SFC control software window
opens.
u
Tap the
[Verify]
button to ensure that
all modules are communicating
correctly.
7.2
Positioning of the sample
NOTE
The capillary tubes should descend in a straight line and without tension.