background image

 
 

 

 

12. Fault Finding 

 

 

 

 

For other symptoms not listed, please refer to BSB Technical Sales Office 

 
 
 
 
 
 
 

 

 
 

 

Symptom 

Fault 

Corrective Action 

 

 

Damper does not travel 
fully open / close smoothly 
or has become stuck 

Internal foreign object 
fouling blade 

Inspect / remove items 

Clean and lubricate. (Refer to 11.3/11.4) 

Casing dented/damaged or 
not round 

Minor damage may be corrected carefully with a soft mallet. (

BSB 

always recommend replacement of damaged dampers) 

Damper internals have 
been exposed to moisture 

Gently apply pressure to blade by hand to move open. Use                    
Scotch Bright pad RED 07447 grade, wet with duck oil and   clean the 
damper internally at the point where the blade closes. Wipe dry and leave 
clean. ‘Massage’ exposed peripheral blade seal until pliable. 

Damper not in expected 
‘normal’ state 

Fusible link (FL) missing 

Fit Fusible Link (FL) 

– Part No: 201448. 

Fusible link (FL) not 
tightened properly 

Tighten Fusible Link (FL) 

Fusible Link (FL)  has 
activated 

Measure Fusible Link (FL) overall length, which is normally 29.5mm. If 
less than 28mm, replace with new link

– Part No: 201448. 

Fusible Link 

Mechanism too sensitive 

 
 
 

Fusible Link Mechanism 
too sensitive 

Fusible Link (FL) has 
activated 

Measure Fusible Link overall length, which is normally 29.5mm. If less 
than 28mm, replace with new link 

– Part No: 201448. 

Damper case damaged/not 
round 

Check roundness. Reshape if minor adjustment needed. 

(BSB always recommend replacement of damaged dampers). 

 

Circlip on the handle 
lost/damaged

 

Contact BSB Tech Sales.

 

Releases prematurely 

Refer to 3.3.  

Not possible to set 
damper to open position. 

 

 

 

Fusible Link (FL) has 
activated 

Measure FL overall length, which is normally 29.5mm. If less than 
28mm, replace with new link. 

Содержание FD-C

Страница 1: ...e the structure is sufficiently supported to conform to design specification 3 4 Dry wall openings must be lined Please see figure 1 3 5 Ensure that appropriate fire rated plasterboard is used through...

Страница 2: ...Control Officer and or specifying authority 5 10 The installation method contained herein assumes the wall has been built prior to the damper opening preparation Optionally the opening may already be...

Страница 3: ...vet tails on the back of the installation plate A shallow provision to be made as appropriate 7 2 Preferably prepare aperture whilst building wall floor or cut aperture if wall floor already exists 7...

Страница 4: ...e to produce an interference fit The installation plate face and all edges should be glued in place and a bead of intumescent mastic applied at all joints 8 1 4 Note two layers of 50mm min thickness a...

Страница 5: ...he as tested installation method 8 2 7 Screw in 50mm long spiral pig tail fixings through installation plate into batt material utilising one of the pair of corner holes and all intermediate fixing ho...

Страница 6: ...hen required 9 3 The cleats can be easily bent out at right angles by hand using a medium size flat head screwdriver at one of the cleats pressed out corners to start see figure 7 9 4 The cleats can b...

Страница 7: ...dertaken annually Local regulations conditions may override this with periodic Inspection being carried out more frequently where corrosive or dirty conditions prevail The maintenance log should be re...

Страница 8: ...l pliable Damper not in expected normal state Fusible link FL missing Fit Fusible Link FL Part No 201448 Fusible link FL not tightened properly Tighten Fusible Link FL Fusible Link FL has activated Me...

Страница 9: ...LL OPEN FINAL INSPECTION BY Print name Signature Company Date This document is available for free download from the BSB website This document is subject to change without notice BSB Engineering Servic...

Отзывы: