10. Commissioning 

 

10.1 

It is recommended that the blade is only opened and locked in position once the damper has been installed into  
the fire barrier and ductwork is connected. If set and locked open before  installation, handling of the casing can 
cause the fusible link mechanism to actuate and close the blade. Dampers should always be checked that they 
are open and set correctly after installation. 

10.2 

  Do not over-tighten Fusible Link (FL).

 Use light finger pressure only. The mechanism relies on engaging  

         

toothed spring into retention slots to hold blade in position. Rotate handle whilst tightening FL ‘feeling’ for slots.       

         Once engaged, it is only necessary to rotate a further ¼ turn. 

  Do not force handle when FL assembly is set

. This will result in damage to mechanism rendering unit       

       

   

inoperable. 

10.3 

  Check the Installation conforms to specification. Refer to DW/145 E.2 and E.3  (appendix E check lists). 

 

10.4 

     Test Damper as follows:- 

10.4.1 

Remove access doors/flexible duct as appropriate. 

10.4.2 

Check internally that any debris has been removed and the damper internals are clean.  

10.4.3 

Unscrew fusible link (FL) anti-clockwise a couple of turns. Open damper using handle and set to desired blade 
position. (Only set  blade position if being used as additionally as an air balance damper, otherwise set to fully 
open). Retighten the FL. 

10.4.4 

Keeping hands and fingers out of way of the spring-loaded blade and handle, Unscrew the FL quickly.  

            Check visually that the damper blade closes fully. 

10.4.5 

Set the damper blade to the required open position. 

10.4.6 

If damper operates satisfactorily, go to section 14 to complete checklist. If not, see Fault Finding Section 12. 

10.4.7 

It is important to log, and review maintenance frequency based on inspections and test history.  

 

11. Maintenance and Test 

11.1 

 In accordance with BS 9999 Annex W.1, inspection should be undertaken annually. Local regulations/conditions       

            may override this with periodic Inspection being carried out more frequently where corrosive or dirty conditions      
            prevail. The maintenance log should be reviewed at each inspection and the frequency adjusted as required      
            dependent upon findings. (BSB recommend a maximum of 1 year between inspections starting more frequently   
            initially and reduce frequencies only if conditions are proven to allow).  

11.2 

Before starting, note the damper blade position so that it can be left in same position after test . 

11.3 

Remove access doors/flexible duct as appropriate. Check damper is clean and free of dust and  debris, clean if 
necessary, using lightly oiled rag to clean inside of the damper case and blade.  

DEB “duck oil” is recommended.  

11.4 

Where blade axles/bearings are corroded, apply 2 drops of oil and operate a few times. This will free up the 
operation. 

11.5 

Now test damper operation. Keeping hands and fingers out of the way of the spring -loaded handle, Unscrew the 
FL quickly. Check visually that the damper blade closes fully. 

11.6 

Reset the damper blade to its previously set-position at the start of this exercise. 

11.7 

Do not over-tighten Fusible Link (FL).

 Use light finger pressure only. The mechanism relies on engaging 

toothed spring into retention slots to hold blade in position. Rotate handle 

whilst tightening FL ‘feeling’ for slots. 

Once engaged, it is only necessary to rotate a further ¼ turn. 

11.8 

Do not force handle when FL assembly is set.

 This will result in damage to mechanism rendering unit 

inoperable. 

11.9 

If damper operates satisfactorily, complete maintenance log (this should be retained by facilities management).

 

11.10 

If damper does not operate correctly, go to fault-finding section (section 12). Recording findings and corrective 
action necessary to facilitate repair in maintenance log. 

 

11.10.1 

IMPORTANT

. When using powered duct cleaning equipment, with a powered rotary head, it is important that 

contact with the installed damper is not made, as this could result in damage to the damper internals. 

 

 

 

 

 

 

 

Содержание FD-C

Страница 1: ...e the structure is sufficiently supported to conform to design specification 3 4 Dry wall openings must be lined Please see figure 1 3 5 Ensure that appropriate fire rated plasterboard is used through...

Страница 2: ...Control Officer and or specifying authority 5 10 The installation method contained herein assumes the wall has been built prior to the damper opening preparation Optionally the opening may already be...

Страница 3: ...vet tails on the back of the installation plate A shallow provision to be made as appropriate 7 2 Preferably prepare aperture whilst building wall floor or cut aperture if wall floor already exists 7...

Страница 4: ...e to produce an interference fit The installation plate face and all edges should be glued in place and a bead of intumescent mastic applied at all joints 8 1 4 Note two layers of 50mm min thickness a...

Страница 5: ...he as tested installation method 8 2 7 Screw in 50mm long spiral pig tail fixings through installation plate into batt material utilising one of the pair of corner holes and all intermediate fixing ho...

Страница 6: ...hen required 9 3 The cleats can be easily bent out at right angles by hand using a medium size flat head screwdriver at one of the cleats pressed out corners to start see figure 7 9 4 The cleats can b...

Страница 7: ...dertaken annually Local regulations conditions may override this with periodic Inspection being carried out more frequently where corrosive or dirty conditions prevail The maintenance log should be re...

Страница 8: ...l pliable Damper not in expected normal state Fusible link FL missing Fit Fusible Link FL Part No 201448 Fusible link FL not tightened properly Tighten Fusible Link FL Fusible Link FL has activated Me...

Страница 9: ...LL OPEN FINAL INSPECTION BY Print name Signature Company Date This document is available for free download from the BSB website This document is subject to change without notice BSB Engineering Servic...

Отзывы: