8.  Ablative Batt Installation Procedure. 

 

 
 

8.1 

     

Folded Installation Plate Installation 

8.1.1 

The 

installation plate should be supplied ‘factory folded’. 

8.1.2 

The damper should be installed within and affixed to the top of the aperature as shown in figure 4. 

8.1.3 

Fire batt material should be cut to suit void with zero clearance to produce an interference fit.  The installation 
plate face, and a

ll edges should be ‘glued’ in place, and a bead of intumescent mastic applied at all joints. 

8.1.4 

Note 

– two layers of 50mm min thickness are required to comply with the ‘as tested’ installation method.  

8.1.5 

Screw-in 50mm long spiral (pig tail) fixings through installation plate into batt material utilising one of the pair 
of corner holes, and all intermediate fixing holes 

8.1.6 

Recommended minimum void gap (per side) is 60mm and maximum 600mm. If folded, 40mm. 

 

 

 

 

 

 

 

 

Fig 4 

Содержание FD-C

Страница 1: ...e the structure is sufficiently supported to conform to design specification 3 4 Dry wall openings must be lined Please see figure 1 3 5 Ensure that appropriate fire rated plasterboard is used through...

Страница 2: ...Control Officer and or specifying authority 5 10 The installation method contained herein assumes the wall has been built prior to the damper opening preparation Optionally the opening may already be...

Страница 3: ...vet tails on the back of the installation plate A shallow provision to be made as appropriate 7 2 Preferably prepare aperture whilst building wall floor or cut aperture if wall floor already exists 7...

Страница 4: ...e to produce an interference fit The installation plate face and all edges should be glued in place and a bead of intumescent mastic applied at all joints 8 1 4 Note two layers of 50mm min thickness a...

Страница 5: ...he as tested installation method 8 2 7 Screw in 50mm long spiral pig tail fixings through installation plate into batt material utilising one of the pair of corner holes and all intermediate fixing ho...

Страница 6: ...hen required 9 3 The cleats can be easily bent out at right angles by hand using a medium size flat head screwdriver at one of the cleats pressed out corners to start see figure 7 9 4 The cleats can b...

Страница 7: ...dertaken annually Local regulations conditions may override this with periodic Inspection being carried out more frequently where corrosive or dirty conditions prevail The maintenance log should be re...

Страница 8: ...l pliable Damper not in expected normal state Fusible link FL missing Fit Fusible Link FL Part No 201448 Fusible link FL not tightened properly Tighten Fusible Link FL Fusible Link FL has activated Me...

Страница 9: ...LL OPEN FINAL INSPECTION BY Print name Signature Company Date This document is available for free download from the BSB website This document is subject to change without notice BSB Engineering Servic...

Отзывы: