FD-C Damper Installation, Operating & Maintenance Instructions 

 

1.  Storage 

1.1 

Dampers received on site should be stored in a purpose made storage area, where they can be protected     
from moisture, dust and impact damage until required. Dampers are designed for installation within internal 
normal dry filtered H&V systems. 

 

2. 

Health and Safety 

2.1 

Only competent personnel may carry out the work outlined in this document. 

2.2 

Wear appropriate Personal Protective Equipment as required for safe working conditions and as site rules 
dictate. 

2.3 

Do not introduce fingers across the open blade or near to the spring loaded handle when releasing. 

2.4 

Where dampers are only accessible with the need for additional elevation, any equipment used should be done  
so with due consideration to the Work at Height regulations 2005 and current site rules.  

 

3.  Important 

3.1  These instructions should be read in their entirety before commencing work. The installer must be  familiar with    

the fire separating element construction detail that is produced by that particular manufacturer

, and the “as 

tested

” damper installation method, as appropriate for that fire separation barrier. 

3.2  Do not over-tighten Fusible Link (FL). Do not force handle when FL assembly is set. Refer to section s 10 and 11 

for testing. 

3.3  Check internally that any debris has been removed and ductwork is connected. If set and locked open before 

installation, rough handling of the casing on larger sizes can cause the fusible link mechanism to actuate and 
close the damper. For existing dry walls 

– When cutting the opening for damper, and (partial) removal of stud is 

unavoidable, ensure the structure is sufficiently supported to conform to design specification . 

3.4  Dry wall openings must be lined. Please see figure 1. 

 

    

 

 
3.5 

Ensure that appropriate ‘fire-rated’ plasterboard is used throughout the construction of drywall partitions that        
need to act as fire-barriers. Ductwork to be fitted and connected in accordance with DW 144  / DW145. 
Aluminium rivets should be used (to act as breakaway-joint). If fire resisting ductwork is being fitted to the 
dampers use the appropriate tested fire resisting fastenings. The use of Tec Screws is not recommended. 

3.6  In accordance with TR/19 and B&ESA DW144 and DW145 access doors/panels/flexi-duct should be fitted 

adjacent to the damper to allow commissioning, servicing and cleaning. Access doors should not be obstructed. 

3.7  All installations are subject to local Building Control Approval (BCA). Tested Installations are detailed here in. If 

the proposed installation deviates to that shown, acceptance from BCA should be sought before proceeding.   

3.8  Refer to main product brochure for full details and specification. 
3.9  Where more than one duct penetrates a wall or floor, adjacent fire damper a ssemblies should be separated by  

             a structural element with a minimum width of 200mm (to comply with BS EN1366 -2

. Sec’n 13.6), Exceptions to    

             this are Ablative Batt penetration installations that also allows for overlapping plates. 

 

4.  Equipment required 

4.1 

 Equipment and tools will vary dependent upon the fire barrier construction that the damper is being installed             

      within. Standard equipment that are normally used for the building of the particular bar rier should suffice. 

4.2 

 Access-equipment as necessary (steps pr platforms). 

4.3 

 Cordless drill and various dia. drill bits / drivers to suit Installation Plate fixings, and duct connection fixings. 

 
 

Figure 1 

Lined Opening 

 

O  

Opening to be lined 

Содержание FD-C

Страница 1: ...e the structure is sufficiently supported to conform to design specification 3 4 Dry wall openings must be lined Please see figure 1 3 5 Ensure that appropriate fire rated plasterboard is used through...

Страница 2: ...Control Officer and or specifying authority 5 10 The installation method contained herein assumes the wall has been built prior to the damper opening preparation Optionally the opening may already be...

Страница 3: ...vet tails on the back of the installation plate A shallow provision to be made as appropriate 7 2 Preferably prepare aperture whilst building wall floor or cut aperture if wall floor already exists 7...

Страница 4: ...e to produce an interference fit The installation plate face and all edges should be glued in place and a bead of intumescent mastic applied at all joints 8 1 4 Note two layers of 50mm min thickness a...

Страница 5: ...he as tested installation method 8 2 7 Screw in 50mm long spiral pig tail fixings through installation plate into batt material utilising one of the pair of corner holes and all intermediate fixing ho...

Страница 6: ...hen required 9 3 The cleats can be easily bent out at right angles by hand using a medium size flat head screwdriver at one of the cleats pressed out corners to start see figure 7 9 4 The cleats can b...

Страница 7: ...dertaken annually Local regulations conditions may override this with periodic Inspection being carried out more frequently where corrosive or dirty conditions prevail The maintenance log should be re...

Страница 8: ...l pliable Damper not in expected normal state Fusible link FL missing Fit Fusible Link FL Part No 201448 Fusible link FL not tightened properly Tighten Fusible Link FL Fusible Link FL has activated Me...

Страница 9: ...LL OPEN FINAL INSPECTION BY Print name Signature Company Date This document is available for free download from the BSB website This document is subject to change without notice BSB Engineering Servic...