Technical information
and start-up
BSC624-12V-B
62
PROCEDURE STEP
ILLUSTRATION / OTHER INFORMATION
9.
Insert the crimp contact socket of the interlock loop
(1) into the socket insert.
For the pin assignment, please refer to chapter
7.2 Pin assignment of HV power connector
(device side)
10.
Insert the crimp contact socket into the socket insert
(1).
Pull the socket insert (1) into the carrier housing (2).
For the pin assignment, please refer to chapter
7.2 Pin assignment of HV power connector
(device side)
11.
Put the gasket (1) onto the carrier housing (2).
Put on the straight carrier housing (3).
Screw together the carrier housing (2) with the
straight carrier housing (3).
Before tightening, check the tight fit of the gasket
(1).