![BRP Evinrude Скачать руководство пользователя страница 85](http://html1.mh-extra.com/html/brp/evinrude/evinrude_installation-manual_2820608085.webp)
83
PREDELIVERY
BEFORE START-UP
5
PREDELIVERY
BEFORE START-UP
Gearcase Lubricant
With outboard vertical, check the gearcase lubri-
cant level:
•
Remove the lubricant level plug. Lubricant must
be even with the bottom of the threaded hole.
•
A clean tie strap can be used as a “dip stick” if
the lubricant level is not obvious.
•
Add
HPF PRO
gearcase lubricant as needed.
Oil Level
Make sure oil tank contains an adequate supply of
the correct lubricant for the outboard and that the
LOW OIL warning has been tested. Refer to
Rec-
ommended Lubricants
on p. 77.
When starting the outboard for the first time, refer
to
OIL SUPPLY PRIMING
on p. 79.
Trim and Tilt Fluid
Make sure trim and tilt reservoir is full before run-
ning outboard:
•
Tilt the outboard and engage the tilt support.
•
Remove filler cap and check fluid level.
•
Three Ram System
–Add
Power Trim/Tilt Fluid
or
GM Dexron II
, as needed, to bring level to the
bottom of the fill plug threads.
1.
Gearcase lubricant level
000072
1
A
CAUTION
Correct fluid level must be maintained to
ensure operation of the impact protection
built into the unit.
Three Ram System, 75 - 300 HP
1.
Filler cap
004277
1
Содержание Evinrude
Страница 1: ......
Страница 2: ......
Страница 32: ...30 BOAT RIGGING NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 52: ...50 OUTBOARD INSTALLATION NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 76: ...74 OUTBOARD RIGGING NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 100: ......