![BRP Evinrude Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/brp/evinrude/evinrude_installation-manual_2820608026.webp)
24
BOAT RIGGING
REMOTE OIL TANK INSTALLATION (V4 – V6)
Place floor bracket on center line between end
lines. Use the inner bracket holes as guides to drill
two 5/32 in. (4 mm) pilot holes.
3 G
ALLON
(11.4 L) T
ANK
Place rods into floor bracket and secure floor
bracket with lag bolts.
Place oil tank onto floor bracket. Assemble cross-
bar onto hook rods, install flat washers and lock-
nuts. Tighten locknuts to securely hold tank.
1.8 G
ALLON
T
ANK
Place rods into floor bracket and secure floor
bracket with lag bolts.
Place oil tank onto floor bracket. If cover is not
pre-assembled, route oil supply hose and harness
through the cover and position cover on the oil
tank. Attach spring-loaded rods to cover.
COB5381
1.
Rods
2.
Lag bolts
22241B
1.
Crossbar
DRC7418
1
2
1
2
1
1.
Rods
2.
Lag bolts
22149A
48704
1
2
1
2
Содержание Evinrude
Страница 1: ......
Страница 2: ......
Страница 32: ...30 BOAT RIGGING NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 52: ...50 OUTBOARD INSTALLATION NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 76: ...74 OUTBOARD RIGGING NOTES NOTES Technician s Notes Related Documents Bulletins Instruction Sheets Other...
Страница 100: ......