12
9.
Install the 3 wire RS-232 cable for unit 2 (figure 2-1) to the 3 pin header labeled INPUT at the top of the second
card near the BNC connectors.
10.
If there is a card intended for the unit 2 position, press the power supply's edge connector for unit 2 onto the second
card as far as it will go.
11.
Mount the second card in the unit 2 position using the five screws provided and install the supplied hardware for
the rear panel support bracket and install the top cover.
Note:
DIP Switch 1 on both the ES-2200S chassis and the cards installed therein controls baud rate.
UP
9600 B/s
DOWN 31.25 kB/s
There is no advantage to either setting, but the baud rate must be set to the same rate for both the installed cards and the
ES-2200S chassis.
Содержание DPS ES-2200
Страница 1: ...ES 2200 Dual Channel Expansion System Operator s Manual...
Страница 56: ...55 Appendices...