background image

 

FAILURE TO CLEAN AND MAINTAIN THIS UNIT AS INDICATED 
CAN RESULT IN POOR PERFORMANCE AND SAFETY 
HAZARDS. NEVER CLEAN WHEN HOT. 

 
NOTE: 

Inspect burn pot periodically to see that holes have not 

become plugged, if so, clean thoroughly. 
 

ASH REMOVAL

 

 
Ashes should be placed in a metal container with a tight-fitting lid. 
The closed container or ashes should be placed on a 
noncombustible surface or on the ground, well away from all 
combustible materials pending final disposal. If ashes are disposed 
of by soil burial or otherwise locally dispersed, they should be 
retained in the closed container until all cinders have thoroughly 
cooled. 
 

ASH DISPOSAL

 

 
To remove ashes: 
 
a. 

Make sure fire is out and firebox is cool. 

 
b. 

Clean heat exchanger tubes (see “

CLEANING

” and Figure 15). 

 
c. 

Remove the burnpots inner section by grasping it and pulling 
straight up (see Figure 16). 

 
d. 

Empty ashes from the inner section and scrape with cleaning 
tool; make sure holes are not plugged. 

 
e. 

Vacuum to remove ashes from the burn chamber interior and 
the burnpot shell. 

WARNING: Make sure ashes are cool to the touch         
before using a vacuum.

 

See “

VACUUM USE

”. 

 
f. 

Dispose of ashes properly.  
(See “

ASH REMOVAL

” above) 

 
g. 

Replace inner section into burnpot; make sure it is level and 
pushed all the way back down and that the igniter hole is to the 
rear when it is reinstalled (see Figure 17). 

 
h. 

Make sure the burnpot is level and pushed all the way in, if the 
collar on the burnpot attached to the fresh air tube is not 
pushed back to meet the firebox wall, the Hot Rod will not work 
properly. 

 
VACUUM USE 

 
We suggest using a vacuum designed for ashes. 
(We recommend LoveLess Ash Vac, 1-800-568-3949 Ext. #27) 
 
Some regular vacuums and shop vacs leak ash into the room. Your 
vacuum or shop vac may have a special filter or bag available to 
eliminate this leakage. 

 

 

 

 
 
 
 

 

 
 

 

 

 

 
 

 

MAINTENANCE 

16 

FIGURE 15 

FIGURE 16 

FIGURE 17 

Igniter Hole 

Содержание Big E SP1000PB

Страница 1: ...For your safety follow the installation directions Contact local building or fire officials about restrictions and installation inspection requirements in your area PLEASE read this entire manual bef...

Страница 2: ...hich is designed for connection to an outside combustion air source The stove will not operate using natural draft or without a power source for the blower systems and fuel feed system and must not be...

Страница 3: ...out air conditioning or in an area where direct sunlight can shine on the unit it is possible this can cause the temperature of the stove to rise to operational levels one of the sensors could then ma...

Страница 4: ...g Door 12 Room Air Fan 12 Re Starting a Warm Stove 13 If Stove Runs Out Of Pellets 13 Refueling 13 Breckwell Maintenance Tool 13 Shutdown Procedure 13 Safety Features 13 Optional Thermostat 14 Thermos...

Страница 5: ...t be placed on a continuous grouted joints noncombustible material such as ceramic tile cement board brick 3 8 millboard or equivalent or other approved or listed material suited for floor protection...

Страница 6: ...d the stove WHEN OUTSIDE AIR IS NOT USED If outside air is not used it is important that combustion air is easily available to the air inlet A closeable outside air register can be used in tightly ins...

Страница 7: ...ent refer to figure 3 3 Always maintain 3 clearance from combustible materials 4 Install L Vent wall thimble per L Vent manufacturer s instructions 5 Attach enough piping to penetrate and extend at le...

Страница 8: ...ester C VERTICALLY INTO EXISTING CHIMNEY SYSTEM Adapters are available to adapt from 3 L Vent to 6 or 8 Class A chimney Figure 7 As an alternative 3 or 4 L Vent can be run inside existing chimney to t...

Страница 9: ...nnect the horizontal pipe by pushing it through the hole in the masonry and lining it up with the branch in the tee Push the pipe into the tee while twisting it to lock it into the tee 7 If desired on...

Страница 10: ...sher to penetrate paint or protective coating to ensure grounding The Breckwell Big E must be securely fastened to the floor of the mobile home through the two holes in the rear of the stove using 2 l...

Страница 11: ...n to its original setting based on the Heat Level Advance setting d RESET TRIM Different size and quality pellet fuel may require adjustment of the 1 feed setting on the Heat Level Advance bar graph T...

Страница 12: ...eckwell approved burnpot NOTE During the first few fires your stove will emit an odor as the high temperature paint cures or becomes seasoned to the metal Maintaining smaller fires will minimize this...

Страница 13: ...om of the hopper b Scrape ashes from burnpot SHUTDOWN PROCEDURE Turning your Breckwell stove off is a matter of pressing the On Off control panel switch The red light will go out The blowers will cont...

Страница 14: ...tion of this owner s manual HIGH LOW THERMOSTAT MODE When engaged in this mode the stove will automatically switch between two settings When warm enough it will switch to the 1 or low setting The room...

Страница 15: ...switch on the control panel g KEEP ALL LOOSE OR MOVEABLE HOUSEHOLD COMBUSTIBLES SUCH AS FURNITURE DRAPES TOYS ETC AT LEAST THREE FEET FROM THE OPERATING STOVE h Maintain proper ventilation It is impor...

Страница 16: ...ight up see Figure 16 d Empty ashes from the inner section and scrape with cleaning tool make sure holes are not plugged e Vacuum to remove ashes from the burn chamber interior and the burnpot shell W...

Страница 17: ...LIAR WITH HOW ASHES AND CREOSOTE ACCUMULATE WITH YOUR OPERATING PRACTICES Use the small wire brush to also clean the inside of the chamber walls above the access doors BLOWERS DANGER RISK OF ELECTRIC...

Страница 18: ...th a brush specifically designed for the type of chimney in use A qualified chimney sweep can perform this service It is also recommended that before each heating season the entire system be professio...

Страница 19: ...der the burnpot make sure the slider plate is in place to seal off the firebox floor 4 Vent pipe is incorrectly installed Check to make sure vent pipe installation meets criteria in owner s manual 5 T...

Страница 20: ...the auger tube for signs of damage such as burrs rough spots or grooves cut into the metal that could have caused a jam 7 The auger motor has failed Remove the auger motor from the auger shaft and tr...

Страница 21: ...r Check the voltage going to the igniter during startup It should be a full current If the voltage is lower than full current check the wiring If the wiring checks out good the board is bad SMOKE SMEL...

Страница 22: ...e the auger shaft inspection plate in the hopper so that you can see the auger shaft Gently lift the auger shaft straight up so that the end of the auger shaft comes up out of the bottom auger bushing...

Страница 23: ...ght at each setting after the stove has completed the startup cycle Make sure the times match the auger timing chart If the auger motor runs constantly the board is bad 8 Combustion blower is not spin...

Страница 24: ...being used and what setting No other types of fuel have been approved for Breckwell pellet stoves If there are signs of other types of fuel being used advise the consumer to stop using them immediatel...

Страница 25: ...FIGURE 21 ELECTRICAL DIAGRAM 25...

Страница 26: ...Hose C M 340 T Auger Motor C E 017 Breckwell Maintenance Tool A TOOL 96 Burnpot A S BURNPOT Circuit Board Control Panel C E 401 Combustion Blower A E 027 Convection Blower A E 033 Door Gasket C G 050...

Страница 27: ...fy the nearest Authorized Breckwell Dealer Provide your name address phone number serial number and model number of the stove date of purchase name and address of installer and as much information as...

Отзывы: