BRAILLO
l
B 650 SF
12
2.1 Unpacking
Unpacking and installation can be done by the user.
After unpacking the Printer, the cover must be removed before lifting the Printer. See chapter 2.2
“Removing the Printer cover”.
Any kind of lifting of the Printer must always be done from the baseboard at the bottom of the
Printer, or from the steel frame, and should be done with extreme care.
Make sure that your Braillo Printer has not been damaged in transport. Check if the outer packing is
damaged; If so, it is possible that the Printer has also been damaged or scratched. If any damages are
found, please contact your distributor or Braillo Norway AS immediately.
Also check that the shipment contains the following items:
1 Printer
1
Ethernet cable 5 m (shielded)
1
USB cable 5 m
1
User’s guide B650 SF
1
Tool kit for service and maintenance
1
Test and packing list
1
Paper roll feeder
1
Friction bar / correction roll
1
Shaft, for the paper roll
1
Paper sample
1
Compressor (optional)
1
Staple and Fold unit
If any of these items are missing, please contact your distributor or Braillo Norway AS.
Important !
It is very important that the Printer’s specified voltage requirement (230 V, +/- 10%) corresponds with
the local power supply available.
If the plug on the mains power cable is to be replaced, note that the yellow/green wire is the grounding
(earthing) wire.
THE PRINTER MUST ALWAYS BE CONNECTED TO GROUND!
After all the items are unpacked, we advice that the transport boxes are stored for possible later use.
Содержание 650 SF
Страница 1: ...Rev April 2018 BRAILLO L NORWAY FOR BETTER BRAILLE AND MORE User s Guide BRAILLO 650 SF...
Страница 2: ...2018 Braillo Norway AS...
Страница 4: ...BRAILLO l B 650 SF 4...
Страница 21: ...BRAILLO l B 650 SF 21 Mains for all units To Printer Paper Roll Feeder connector Staple and Fold connectors...
Страница 33: ...BRAILLO l B 650 SF 33 3 OPERATING THE PRINTER 3 1 Operating panels Printer panel Staple and Fold panel...
Страница 104: ...BRAILLO l B 650 SF 104 Frame complete...
Страница 133: ...BRAILLO l B 650 SF 133 7 15 Complete schematic pneumatic...
Страница 135: ...BRAILLO l B 650 SF 135 7 17 Schematic electrical 230V...
Страница 137: ...BRAILLO l B 650 SF 137 7 19 Schematic PLC...
Страница 139: ...BRAILLO l B 650 SF 139 7 21 Schematic sensors Picker pos Vacuum sensor...
Страница 140: ...BRAILLO l B 650 SF 140 Folding ready Stackholder neg Output sensor...
Страница 141: ...BRAILLO l B 650 SF 141 Stapel anvil pos Paper roll below minimum diameter Stop Eject Stapling anvil neg...
Страница 142: ...BRAILLO l B 650 SF 142 Door 1 switch Door 2 switch Stapling position analog sensor...
Страница 143: ...BRAILLO l B 650 SF 143 7 22 Schematic staplers position 7 23 Schematic pneumatic valves...
Страница 150: ...BRAILLO l B 650 SF 150 115 cm 77 cm 112 cm 8 5 Measurements All measurements in centimetres...
Страница 151: ...BRAILLO l B 650 SF 151 9 GENERAL INFORMATION 9 1 Declaration of conformity...
Страница 155: ...BRAILLO l B 650 SF 155...