background image

, inc.

Mincey Marble Mfg., Inc.

1940 New Harvest Road

Gainesville, GA 30507

Ph: 800.533.1806

Fx: 770.531.0935

www.minceymarble.com 

 

MATERIALS / TOOLS NEEDED CHECKLIST

 

PRE-INSTALLATION PIECES / PARTS LIST

 

ENCLOSURE SYSTEM INSTALLATION

Installation Instructions for Mincey Marble Manufacturing’s 

Brunswick Bow Front Shower Enclosures

ATTENTION:  Prior to starting the installation, please read through these instructions.  This 

will help avoid any unneccesary breakage.  Any breakage due to handling or installing this 

enclosure system is the responsibility of the installer and is not covered under the Mincey 

Warranty.  Mincey recommends that two people are used to install this shower enclosure 

system due to the weight and fragility of the glass panels.  Mincey also recommends that  

you protect the glass, especially the bottoms, and shower pan during installation.

These installation instructions apply to the Mincey Brunswick Bow Front Shower Enclosure System.  In these  

instructions we are going to use an example with a 60” wide shower with the door opening on the right. 

All Drawings Are Not To Scale.

6WDUWE\XQFUDWLQJWKHPDWHULDOVDQGFRQ¿UPWKDWDOORIWKHSDUWVDQGSLHFHVDUHSUHVHQW

  The  

Required Tools are listed below.  The contents of the Hardware Kit are listed below.  The Parts Diagram is on the 

following page.  Before you begin the installation, make sure that all of the pertinent surfaces are clean and free 

of dust, debris and any shavings.  After you perform any drilling, you will want to make sure the surfaces are 

clean again - this includes the Shower Pan and the Shower Panel Walls.

 

MATERIALS / TOOLS NEEDED

 

INCLUDED WITH THE ENCLOSURE

WALL

ANCHORS

QTY: 6

1/2” 

 

SCREWS, 

QTY: 8

DRILL (CORDED OR CORDLESS),

5/16” MASONRY DRILL BIT,

1/8” METAL DRILL BIT

TAPE MEASURE

PENCIL

LEVEL

CAULK GUN,

100% SILICONE

RUBBER MALLET

HACK SAW

PHILLIPS HEAD SCREWDRIVER

TOP & BOTTOM

FGP CLIPS 

QTY: 2

TOP

ROLLER 

QTY: 2

BOTTOM

ROLLER 

QTY: 2

DOOR STRIKE

    WALL JAMB 

        QTY: 1

DOOR PULL 

QTY: 1

TOWEL BAR 

QTY: 1

HEADERS &

FOOTERS QTY: 2

SLIP-ON VERTICAL

WALL JAMBS  QTY: 2

DOOR STOPS 

QTY: 2

FGP BUBBLE 

SEAL QTY: 2

F SEAL 

QTY: 2

VERTICAL WALL

  JAMB COVER TRIM

     QTY: 2

JAMBS TOP 

COVERS QTY: 4

1 1/4” 

 

SCREWS, 

QTY: 8

1 3/4” 

 

SCREWS, 

QTY: 6

Содержание Brunswick Bow Front

Страница 1: ...o use an example with a 60 wide shower with the door opening on the right All Drawings Are Not To Scale 6WDUW E XQFUDWLQJ WKH PDWHULDOV DQG FRQ UP WKDW DOO RI WKH SDUWV DQG SLHFHV DUH SUHVHQW The Required Tools are listed below The contents of the Hardware Kit are listed below The Parts Diagram is on the following page Before you begin the installation make sure that all of the pertinent surfaces ...

Страница 2: ...RAME FOOTER 1 9 SLIP ON VERTICAL WALL JAMBS 2 10 DOOR STRIKE WALL JAMB 1 11 MAGNETIC SEAL 1 12 WALL ANCHORS 6 13 1 3 4 ROUND HEAD SCREWS 6 14 1 1 4 ROUND HEAD SCREWS 8 15 VERTICAL WALL JAMB COVER TRIM 2 16 BOTTOM ROLLERS WITH STUD 2 17 TOP ROLLERS 2 18 FGP CLIPS 2 19 1 2 ROUND HEAD SCREWS 8 20 DOOR STOPS 2 21 LONG F SEAL 1 22 SHORT F SEAL 1 23 FGP JAMB TOP COVER 1 24 DOOR STRIKE JAMB TOP COVER 1 2...

Страница 3: ...he Door will open on before the enclosure is to be assembled In the example in these instructions the Fixed Glass Panel will be on the Left and the Door will be on the Right THERE ARE TWO PRE DRILLED HOLES TO ACCEPT THE FIXED GLASS PANEL CLIPS AND THEY WILL BE ON THE LEFT SHORTER SIDE WHEN THE DOOR WILL BE ON THE RIGHT Press the BUBBLE SEALS onto the Fixed Glass Panel on the TOP and BOTTOM Slide t...

Страница 4: ...RTICAL WALL JAMBS FLUSH TO THE WALLS LEVEL AND MARK HOLES TO BE DRILLED IN ALL THREE LOCATIONS REMOVE THE DOOR ASSEMBLY DRILL HOLES USING 5 16 MASONRY BIT CLEAN DUST AND DEBRIS INSTALL ANCHORS PUT THE DOOR ASSEMBLY BACK IN PLACE TIGHTEN SECURELY USING THE 1 3 4 SCREWS DO NOT OVERTIGHTEN Once you have marked the holes to be drilled remove the Door Assembly from the Shower Using a 5 16 Masonry Bit d...

Страница 5: ...LERS ON THE GLASS DOOR TO THE OUTSIDE OF THE SHOWER THE PLUNGER GOES TO THE TOP TO SECURE THE DOOR WITH TENSION When the Rollers have been installed place the Glass Door inside the Shower To install the Glass Door TILT the Door into the TRACK of the Top Header PRESS the PLUNGERS on the Bottom Rollers and pop the door into the TRACK of the Bottom Header RX ZLOO ZDQW WR DGMXVW WKH RWWRP 6FUHZV RQ WK...

Страница 6: ...n install the TOP CORNER PIECES for the Wall Jambs The example below shows the Fixed Glass Panel DOO DPE FRYHUV EHLQJ LQVWDOOHG QVWDOO WKH 0 29 5 UVW WKHQ WKH 29 5 IRU WKH 6 3 21 9 57 0 6 7KH DUH VSHFL F WR HDFK VLGH WKH RRU 6WULNH DOO DPE DQG WKH L HG ODVV 3DQHO DOO DPE SNAP THE VERTICAL WALL JAMB COVER TRIM PIECES ON BOTH SIDES INSTALL THE FIXED GLASS PANEL WALL JAMB COVER TRIM INSTALL THE SLIP ...

Отзывы: