![Bradley Terrazzo WF2613 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/bradley/terrazzo-wf2613/terrazzo-wf2613_installation-manual_2800014011.webp)
Installation
WF2613
Bradley
•
215-1451 Rev. F; ECN 13-00-001
3/5/2013 11
7
Electrical Connections for Infrared
A
Connect the wires with the female
connectors from the infrared module
to the solenoid valve.
B
D
E
Connect the wires with the male
connectors from the infrared
module to the transformer wires.
Plug the 24 VAC Class II transformer
into a 110 VAC GFI outlet.
Turn the water supply on and check
for leaks and adequate water flow.
Replace the access panels on both
sides of the washfountain.
Do not use for two minutes after making power connection. The
sensors will take up to eight minutes (without being used) to
adapt to the bowl if another object is detected during the two-
minute start-up period.
Clean sprayhead if necessary. Adjust volume control
valve, if necessary, to control the flow of water.
Transformer
Wires with
Femal
Connectors
Wire with
Male
Connector
Wires with
Female
Connector
Infrared Module
24 VAC Transformer
(S83-134)
Manual Mixing Valve (S01-038)
Optional Thermostatic
Mixing Valve (S01-525)
Stop/Strainer/Check
Valve (S60-003)
Solenoid
Valve
Assembly
(S08-055)
Volume Control
Valve (S02-045)