Installation
AV90
Bradley
• 215-1773 Rev. D; ECN 13-08-028
1/21/2014
17
Supply Hose, Cold
½" x 24"
Supply Hose, Hot
½" x 24"
Valve,
Cold Supply
Valve, Hot
Supply
Angled Supply Stop
⁵⁄₈
" O.D. x
³⁄₈
" O.D.
7b Valve Assembly
For clarity, the front dryer
hose is not shown.
A
Loosen the compression nut. Push the supply
tube firmly into the tube connector until it is
seated. Retighten the compression nut by hand.
C
Attach hot and cold
hoses to the valve.
B
Attach angle stops to hot and cold
stub outs. Attach 1/2" supply hoses
to hot and cold supply stops.
D
Attach transformer circuit plug to
transformer connector plug on
gang valve bracket. attach gang
valve to the wall. See Step 1a for
valve bracket anchor locations.
Three-Station Valve
TMA Valve (S45-2489) is shown
TL Valve (S45-2488) is similar
Red
Green
Black
¼" Supply Tube (from
faucet) black, left hand
¼" Supply Tube (from
faucet) green, center
¼" Supply Tube (from
faucet) red, right hand