21
Venting (Part II) continued-
THROUGH THE WALL VENTING: (HORIZONTAL VENTING)
Cut a 2 1/2 in.
(6.4 cm)
diamet er hole in t he w all at t he point w here t he
vent connect or is going t o pass t hrough t he w all. Use t he proper cement t o
secure t he 45° vent t erminal provided w it h t he w at er heat er t o t he vent
connect or. The dist ance bet w een t he edges of t he 45° vent t erminal and
t he ext erior w all (see Figure 7) must be at least 1 in.
(2.5 cm)
. Use t he
proper cement and assembly procedures t o secure t he vent connect or
joint s bet w een t he t erminal and t he blow er out let . Provide support
bracket s f or every 5 f eet
(1.5 m)
of horizont al vent .
3” VENT INSTALLATION
2” VENT INSTALLATION
Figure 7
IMPORTANT
All of the Venting connections must be leak checked with a soap and
water solution upon initial start up of the water heater. Any leaks must
be repaired before continuing operation of the water heater.
Содержание Combi2 TTW C-DW2-TW50T10FBN
Страница 15: ...15 Venting Part I continued 4 VENT INSTALLATION 3 VENT INSTALLATION Figure 3...
Страница 34: ...34 Wiring Diagram Figure 10...
Страница 36: ...36 Lighting and Shutdown instructions...
Страница 48: ...48 NOTES...