![Boumatic SmartWay 90 Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/boumatic/smartway-90/smartway-90_installation-and-operators-manual_2796607060.webp)
Page 60
9e1060
Attention!
7. DECOMMISSIONING
7.1 SPECIAL PERSONNEL QUALIFICATION REQUIRED FOR DECOMMISSIONING
Decommissioning may only be performed by specially qualified personnel in accordance with the safety instruc-
tions.
Also see the section on “Personnel qualification“.
7.2 SAFETY INSTRUCTIONS FOR DECOMMISSIONING
In order to prevent damage to property and/or life-threatening injury to people when decommissioning, the fol-
lowing points must always be observed:
• All of the steps involved in the decommissioning work must be worked through in the order specified.
• First of all, make the operating area for decommissioning completely safe.
• Make sure that operating supplies are disposed of without harming the environment.
Also read the chapter on “Safety“.
7.3 SPECIAL DANGERS INVOLVED IN DECOMMISSIONING
• Components which have not been removed correctly may fall off or twist.
• There is a risk of injury from open components /tools/… with sharp edges.
• Suspended loads can fall and then there will be a risk of death – do not stand underneath suspended
loads!
7.4 FINAL DECOMMISSIONING / DISPOSAL
After decommissioning, all of the components should be handled correctly and disposed of in accordance with
valid local requirements on the disposal or recycling of waste.
Attention!