
3-8
370 Outrage
Section 3 • Systems & Components Overview & Operation
R
The use of fuels containing ethanol higher than
10 percent (E-10) can damage your engine and/
or fuel system and will void the warranty.
!
CAUTION
E85 FUELS COULD SERIOUSLY DAMAGE
YOUR ENGINES AND MUST NEVER BE USED.
the tank. If it is not possible to remove the fuel,
maintaining a full tank of fuel with a fuel stabilizer
added to provide fuel stability and corrosion
protection is recommended.
• Add fuel stabilizer/treatment at
manufacturers recommended dosage.
• Run engine(s) for 10 minutes.
• Shut OFF fuel valve.
• Allow engine to run util it stops.
• Top off fuel tank, leaving space for
expansion. DO NOT fi ll to point of
overfl ow.
• DO NOT cap the tank vent.
Example of Phase Separation
Fig. 3.8.1
1
2
3
4
1
2
3
4
CONDENSATION
UPPER PHASE (WATER+FUEL+ETHANOL)
LOWER PHASE (WATER+ETHANOL)
FUEL INLET TO ENGINE
REFER TO THE ENGINE MANUFACTURER’S MANUAL
IN YOUR OWNER’S MANUAL PACKET FOR COMPLETE
INSTRUCTIONS AND WARRANTY.
A partially full tank is not recommended because
the void above the fuel allows air movement that
can bring in water through condensation as the air
temperature moves up and down. This condensation
could potentially become a problem.
Содержание 370 Outrage
Страница 2: ......
Страница 20: ...xx 370 Outrage R THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 146: ...3 66 370 Outrage Section 3 Systems Components Overview Operation R THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 162: ...4 16 370 Outrage Section 4 Electrical System R Battery Diagram Sheet 1 Fig 4 16 1...
Страница 163: ...4 17 Section 4 Electrical System 370 Outrage R Section 4 Electrical System Battery Switch Panel Sheet 2 Fig 4 17 1...
Страница 164: ...4 18 370 Outrage Section 4 Electrical System R Helm Breaker Panel Sheet 3 Fig 4 18 1...
Страница 165: ...4 19 Section 4 Electrical System 370 Outrage R Section 4 Electrical System Helm Switch Panel Sheet 4 Fig 4 19 1...
Страница 166: ...4 20 370 Outrage Section 4 Electrical System R Bait Prep Station Switch Panel Sheet 5 Fig 4 20 1...
Страница 167: ...4 21 Section 4 Electrical System 370 Outrage R Section 4 Electrical System Lighting Schematic Deck Sheet 6 Fig 4 21 1...
Страница 168: ...4 22 370 Outrage Section 4 Electrical System R Windlass Schematic Sheet 7 Fig 4 22 1...
Страница 170: ...4 24 370 Outrage Section 4 Electrical System R DC Distribution Panel Sheet 9 Fig 4 24 1...
Страница 171: ...4 25 Section 4 Electrical System 370 Outrage R Section 4 Electrical System DC Wiring Schematic Cabin Sheet 10 Fig 4 25 1...
Страница 172: ...4 26 370 Outrage Section 4 Electrical System R Hardtop Scematic Sheet 11 Fig 4 26 1...
Страница 173: ...4 27 Section 4 Electrical System 370 Outrage R Section 4 Electrical System Stereo Diagram Sheet 12 Fig 4 27 1...
Страница 174: ...4 28 370 Outrage Section 4 Electrical System R 120V 60Hz Shore Power Schematic Sheet 13 Fig 4 28 1...
Страница 176: ...4 30 370 Outrage Section 4 Electrical System R 220V 50Hz Shore Power Schematic Sheet 15 Fig 4 30 1...
Страница 178: ...4 32 370 Outrage Section 4 Electrical System R Bow Table Option Bow Thruster Schematic Sheet 17 Fig 4 32 1...
Страница 180: ...4 34 370 Outrage Section 4 Electrical System R Bilge Wiring Schematic Sheet 19 Fig 4 34 1...
Страница 182: ...4 36 370 Outrage Section 4 Electrical System R 12V 30 AMP receptacles Option Sheet 21 Fig 4 36 1...