20
Hydraulic Commissioning
1 – Float Valve Setting
Ensure that the break tank float valve is set to its lowest position:
AX & PF Units
Min,i Midi & Digifiller Units
If a drain valve is fitted to the break tank, ensure that it is closed. Then, turn on the mains water
supply and allow the break tank to fill.
When the float valve operates for the first time, it may not close immediately, causing
the break tank to overfill. Once the internals of the valve have been fully wetted this
should not occur again.
2 – Bleeding Pumps
This step is only necessary for AX, PF, Digifiller and Midi units. For Mini units, move on to the next
step.
Make sure that the internal isolation valve within the pressurisation unit is closed by
following the steps below. Failure to do this may cause injury or damage to the
equipment, system or property.
Содержание AX1-2.5E
Страница 33: ...33 Wiring Diagram ...
Страница 34: ...34 Service Log This service log should be completed by the service engineer after each annual service ...
Страница 35: ...35 ...
Страница 41: ...41 Notes ...
Страница 42: ...42 Notes ...
Страница 43: ...43 Notes ...
Страница 44: ...44 Notes BOSS Pressurisation O M Manual Version 8 February 2014 ...