10
Mini (MX) Clearance and Connection Requirements
Connection
Size
Notes
Mains
Water Feed
½” BSP M
An isolation valve must
be installed on the mains
water feed for servicing.
Break Tank
Overflow
22mm
Guidance on drainage
requirements should be
obtained from the local
water authority.
System
Connection
¼” BSP F
The pressurisation unit
and expansion vessel
should be connected to
the system at the same
point.
The point of connection
should be in the system
return, on the suction
side of the circulation
pump.
Non-return valves,
pressure reducing valves
and RPZ valves must not
be used.
Min 50mm
Содержание AX1-2.5E
Страница 33: ...33 Wiring Diagram ...
Страница 34: ...34 Service Log This service log should be completed by the service engineer after each annual service ...
Страница 35: ...35 ...
Страница 41: ...41 Notes ...
Страница 42: ...42 Notes ...
Страница 43: ...43 Notes ...
Страница 44: ...44 Notes BOSS Pressurisation O M Manual Version 8 February 2014 ...