18
en | Preparing for installation
DIVAR IP all-in-one 7000 3U
2021.10 | V02 | DOC
Installation manual
Bosch Security Systems B.V.
4
Preparing for installation
Read this section in its entirety before you begin the installation.
4.1
Choosing the installation location
–
Place the system near at least one grounded power outlet.
–
Place the system in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic fields are generated.
–
Leave approximately 25 inches clearance in front of the rack to be able to open the front
door completely.
–
Leave approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.
i
Notice!
This equipment is intended for installation in Restricted Access Location or equivalent.
i
Notice!
This product is not suitable for use with visual display work place devices according to §2 of
the German Ordinance for Work with Visual Display Units.
4.2
Rack precautions
!
Warning!
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
precautions to ensure that the system remains stable. The following guidelines are provided
to ensure your safety:
–
Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor
with the full weight of the rack resting on them.
–
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
–
When mounting this unit in a partially filled rack, load the rack from the bottom to the top
with the heaviest component at the bottom of the rack.
–
In single rack installations, attach stabilizers to the rack.
–
If the rack is provided with stabilizing devices, install the stabilizers before mounting or
servicing the unit in the rack.
–
In multiple rack installations, couple the racks together.
–
Always make sure the rack is stable before extending a component from the rack.
–
Extend only one component at a time - extending two or more simultaneously may cause
the rack to become unstable.
4.3
General system precautions
–
Review the electrical and general safety precautions that came with the components you
are adding to your chassis.
–
Determine the placement of each component in the rack before installing the rails.
–
Install the heaviest components on the bottom of the rack first, and then work up.
–
Use a regulating uninterruptible power supply (UPS) to protect the system from power
surges and voltage spikes if you want to keep your system operating in case of a power
failure.
–
Allow the hard drives and power supply modules to cool before touching them.