1 689 989 087
2018-07-24
|
Robert Bosch GmbH
Preparing for testing | CRI/CRIN 848H | 75
en
1
2
3
4
5
458847-11_Pal
Fig. 43: Tightening test pressure line
14.
Check that the injector is seated vertically in the
solder in the injector holder. If the injector is not
seated vertically in the solder, straighten it (refer to
Fig. 44).
Fig. 44: Injector not straight
5.2.3
Connecting the test pressure line
!
Note tightening torque
1.
Remove the union nut (Fig. 47, item 1) and sealing
cone (Fig. 47, item 2) from the high-pressure outlets
of the distributor rail.
2.
Check that the thrust ring (Fig. 45, item 4) is secure-
ly tightened (left-hand thread).
3.
Connect the test pressure line (Fig. 45, item 1) with
the appropriate adapter nut (Fig. 45, item 5) to the
high-pressure outlet of the injector (Fig. 45, item 3).
Do not tighten.
4.
Connect the other end of the test pressure line with
M16x1.5 adapter nut to the high-pressure outlet
(Fig. 45, item 2) of the distributor rail. Do not tighten.
5.
Tighten the test pressure line (Fig. 45, item 1) with a
wrench, whilst providing support for the screw con-
nection at the injector and the distributor rail. Only
tighten the test pressure line at the upper hexagon
(refer to item 46).
2
1
3
4
5
25-30 Nm
25-30 Nm
458847
-32_Pal
Fig. 45: Injector clamping
25 - 30 Nm
458844-05_Pa
l
Fig. 46: Tightening test pressure line
Содержание CRI 848H
Страница 2: ......