1 689 989 087
2018-07-24
|
Robert Bosch GmbH
68 | CRI/CRIN 848H | Initial startup
en
25 - 30 Nm
2
3
4588
45-15
_Pal
1
Fig. 28: Hydraulic connection on EPS 815
4.3
Fitting frame
4.3.1
EPS 708
1.
Position the frame (Fig. 29, item 4) on the securing
pin (Fig. 29, item 3) in the test area of the EPS 708.
2.
Secure the frame with an M12 hexagon nut (Fig. 29,
item 1) and washer A12.4 (Fig. 29, item 2).
458847-09_Pal
4
1
2
3
Fig. 29: Fitting on EPS 708
Содержание CRI 848H
Страница 2: ......