![bora PL 540 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/bora/pl-540/pl-540_mounting-and-installation-instructions-manual_2788244019.webp)
19
Use the delivered drill template to carry out the panel
bore on the control box. Position the drill template in
the centre of the extractor unit, mark the drill hole
positions and drill the hole for the control box.
Establish the electrical connection in the floor unit
before the control box is installed and fitted.
Use the accompanying compensation plates to
achieve a total panel thickness of 36 mm, i.e. panel
thickness and compensation plates taken together are
36 mm thick. The total thickness of 36 mm must be
adhered to in order to ensure proper functioning of the
control box. The following table shows which
compensation plates have to be used with which panel
thicknesses:
Installation of the control box
GB
Содержание PL 540
Страница 11: ...11 Fl chenb ndige Montage Aufsatzmontage Ausschnittsma e Kombinationsm glichkeiten D...
Страница 22: ...22 Flushmounting Above surfaceinstallation Dimensions combination options D...
Страница 33: ...33 Montage adjacent Montage en saillie Dimensions de la d coupe Combinaisons possibles de commande F...
Страница 44: ...44 Vlakinbouw Opbouwmontage Uitsparingsmaten combinatiemogelijkheden NL...
Страница 66: ...66 Montajea ras de superficie Montajesuperpuest Medidas de recorte posibilidades de combinaci n E...