12
operation, the Control Unit may be wired in to the pump's power source so that both turn
on and off together, or energized continuously for use with variable speed pumps (Flow
switch will control Cell power but lights will remain on).
Notice:
Do not operate unit until all salt is dissolved in pool water
Wiring:
Power must be shut off at the circuit breaker before performing any wiring. Be sure to
follow local and NEC/CEC electrical codes. The system has been designed to easily wire
into typical in- ground pool systems. To provide safe operation, the unit must be properly
grounded and bonded.
Bonding:
A lug used for bonding is attached to the bottom of the Control Unit. The Control Unit
must be bonded with an 8 AWG copper wire to the pool bonding system.
Electrolytic Cell and Flow Switch Connections:
The Cell and Flow Switch cables have easy plug-in connectors, which attach easily to
the Control Unit. Refer to the diagram below for the location of these connections.
Содержание BLSC
Страница 1: ...BLSC ...