ProxySG 900 Series Maintenance & Upgrade Guide
89
Installation Tasks
To install the Blue Coat ProxySG 900 series appliances appliance into an equipment rack, a
qualified technician must perform the following tasks in the numbered order:
!
CAUTION:
Bracket and slide rail installation (steps 1- 4) can be performed by a single
technician; however, if a mechanical lift is
not
used, BlueCoat recommends the assistance
of two
additional
technicians!
Step
Description
Page
1
“Choose a Rack Mounting Option”
2
3
4
■
or
■
“2-Post Mid Mount Rail
Assembly”
or
■
“2-Post Front Mount Rail
Assembly”
5
“Install the Appliance into the
Equipment Rack”
6
Содержание ProxySG SG900-10
Страница 6: ...6 ProxySG 900 Series Maintenance Upgrade Guide...
Страница 28: ...About This Guide 28 ProxySG 900 Series Maintenance Upgrade Guide...
Страница 34: ...34 ProxySG 900 Series Maintenance Upgrade Guide Fan Assembly...
Страница 56: ...56 ProxySG 900 Series Maintenance Upgrade Guide Memory Module...
Страница 86: ...86 ProxySG 900 Series Maintenance Upgrade Guide BIOS Battery...
Страница 103: ......
Страница 104: ...www bluecoat com...