Task
Procedures
Illustrations
4
SubTiller II
1. All hardware properly tightened
2. Lubrication of grease fittings
3. All decals properly located and readable
4. Other adjustments for machine level height, etc.
5. Overall condition (touch up any scratches, clean and
polish)
6. Operator’s manual
DATE SET UP_______________________________
SIGNATURE________________________________
PRE-DELIVERY CHECKLIST
Dealer Checklist
T
o The Dealer:
Inspect the implement thoroughly after assembly to be certain it is
functioning properly before delivering it to the customer. The following
checklist is a reminder of points to cover. Check off each item as it is
found satisfactory or after proper adjustment is made.
DELIVERY
Review the operator’s manual with the customer. Explain
the following:
1. Safe operation and service
2. Correct machine installation and operation
3. Daily and periodic lubrication and maintenance
4 Daily and periodic inspections
5. Troubleshooting
6. Storing machine
7. Thurston Manufacturing Company parts and service
8. Have the customer write the machine model and serial
number in space provided in manual introduction.
9. Give customer the operator’s manual and encourage
the customer to read the manual carefully.
10. Completion and mailing of warranty registration
form.
DATE DELIVERED__________________________
SIGNATURE_______________________________
MODEL NO.________________________________
SERIAL NO.________________________________