
55
Task
Procedures
Illustrations
SubTiller II
Assembly (Hydraulic Gauge Wheels)
Mounting
jack
2. Attach
(d) (AM2526)
jack handle
with
(e) (BP3096)
3/8” x 2-1/2”
hex cap screw, two
(g) (BP3015)
3/8” flat washers and
(h)
(BP3003)
3/8” hex lock nut.
h
e
1. Position
(a) (AM2518)
9TW-25DL top wing DL jack
on tongue, 21-3/4” from hitch
plate on tongue weldment.
Insert (
b) (BP3099)
5/8” x
6”W x 6”L u-bolts.
Secure with
(c) (BP3038)
5/8”
hex nuts.
b
a
g
BP3099
AM2518
21-3/4”
BP3038
AM2526
BP3096
BP3015
BP3003
c
d