
68
First Line and Planned Maintenance Manual
Frontline Sirius®
5.1 Routine Maintenance
5.1.1 Weekly Checks
5.1.1.1 Control Unit
1. Connect the main electrical power and turn the Patient Selection Switch to Adult or
Paediaitric.
2. Disconnect the mains supply and check that the MAINS FAIL alarm activates.
3. Reconnect the mains electrical power and check that the alarm resets.
4. Turn the ventilator on.
5. Disconnect the O2 and Air hose and turn off the O2 cylinder. The SUPP GAS LOW alarm
should activate.
5.1.2 Six-Monthly Checks
5.1.2.1 Bellows
Each time the bellows assemblies are opened for cleaning, all visible parts should be inspected
carefully and damaged components replaced. The bellows material deteriorates with age and
use, and should be examined and replaced, if necessary every six months.
5.1.2.2 Other Maintenance
Occasionally, maintenance may be required on terms that are not covered by periodic routine
maintenance tasks.
5.1.2.3 Exchanging Fuses
WARNING: The use of incorrectly rated fuses constitutes a fire hazard.
Replace the two fuses only with the correct type and rating of fuse.
1. At the rear of the machine behind the cylinder positions is a small hatch.
2. Unscrew the three screws and lift off the hatch to reveal the fuses in the holder.
3. Exchange the fuses and then replace the hatch.
4. Tighten the screws.
5. If the fuse fails a second time contact a Service Engineer.
5. Routine Maintenance
Содержание Sirius 1000
Страница 17: ...16 First Line and Planned Maintenance Manual Frontline Sirius Notes ...
Страница 27: ...26 First Line and Planned Maintenance Manual Frontline Sirius Notes 1 Technical Description ...
Страница 32: ...31 First Line and Planned Maintenance Manual Frontline Sirius 2 0 User Pre Use Tests 2 User Pre Use Testing ...
Страница 37: ...36 First Line and Planned Maintenance Manual Frontline Sirius Notes 2 User Pre Use Testing ...
Страница 50: ...49 First Line and Planned Maintenance Manual Frontline Sirius 3 0 Full System Test 3 Full System Testing ...
Страница 61: ...60 First Line and Planned Maintenance Manual Frontline Sirius Notes 3 Full System Testing ...
Страница 62: ...61 First Line and Planned Maintenance Manual Frontline Sirius 4 0 Maintenance 4 Maintenance ...
Страница 68: ...67 First Line and Planned Maintenance Manual Frontline Sirius 5 0 Routine Maintenance 5 Routine Maintenance ...
Страница 71: ...70 First Line and Planned Maintenance Manual Frontline Sirius Notes 5 Routine Maintenance ...
Страница 72: ...71 First Line and Planned Maintenance Manual Frontline Sirius 6 0 Planned Maintenance 6 Planned Maintenance ...
Страница 87: ...86 First Line and Planned Maintenance Manual Frontline Sirius Notes 7 Fitting Planned Maintenance Kits ...
Страница 95: ...94 First Line and Planned Maintenance Manual Frontline Sirius Regulators 7 Fitting Planned Maintenance Kits ...
Страница 105: ...104 First Line and Planned Maintenance Manual Frontline Sirius Notes 7 Fitting Planned Maintenance Kits ...
Страница 106: ...105 First Line and Planned Maintenance Manual Frontline Sirius 8 0 Spare Parts 8 Spare Parts ...