13
14
12
11
15
Your faucet can be installed with a 50/50 Pop-Up or
an All Metal Pop-Up:
For a 50/50 Pop-Up installation:
Go To Steps 16 & 17
Go To Steps 16 & 17
For an All Metal Pop-Up installation:
Go To Steps 18 & 19
Go To Steps 18 & 19
12 FLANGE INSTALLATION
Place Plastic Ring (
12A
) and Flange (
12B
) over Valve Body (
12C
) covering
the Valve Body Washers (
12D
). Secure by screwing the Plastic Nut (
12E
) onto
12E
12E
the Valve Body (
12C
).
13 VALVE FUNCTION
COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-
clockwise, open-counterclockwise. The Spout (
13A
) can be rotated around the
Faucet Body in any direction.
14 HANDLE INSTALLATION
Before proceeding, Valve Stems (14A) are to set be in the closed position.
A.
Installing Lever Handle:
Installing Lever Handle: Attach Handle Hub (
14B
) in desired position onto
Valve Stem (
14A
) and secure with Screw. Hand tighten Decorative Lever (
14C
)
onto Handle Hub. Attach Button.
B.
Installing Cross Handle:
Installing Cross Handle: Attach Handle Hub (
14D
) onto Valve Stem (
14A
).
Attach Cross Handle onto Handle Hub and secure with screw. Attach Button.
C.
Installing French Lever Handle:
Installing French Lever Handle: Attach Handle Hub (
14E
) onto Valve Stem
14E
14E
(
14A
). Attach French Lever onto Handle Hub and secure with screw. Attach
Button.
11 SECURING HOSE CONNECTIONS
Slide Clips (
11A
) onto End Bodies (
11B
), beneath the End Connectors (
11C
).
15 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (
15A
) to Faucet Inlets (
15B
). (
Supply lines and
fi ttings are not included.
) Please follow manufacturer’s instructions when
installing supply lines.
POP-UP DRAIN BODY INSTALLATION STEPS
4
ENGLISH
11A
11C
11B
11A
11B
15A
15A
12E
12D
12C
12B
12A
12A
12E
12D
12C
12B
12A
12A
CLOSED
HOT
CLOSED
OPEN
COLD
CLOSED
CLOSED
OPEN
OPEN
14A
14A
14A
14A
15B
LEVER HANDLES
CROSS HANDLES
A
B
C
14B
14C
14D
14E
OPEN
COLD
13A
13A