2
3
4
5
6
Thank you for purchasing this Price Pfi ster bathroom faucet. All Price Pfi ster products are carefully engineered, and factory tested to provide
long trouble-free use under normal conditions. This bathroom faucet is easy to install using basic tools and our easy to follow illustrated
instructions. If you have any questions regarding your bathroom faucet installation call 1-800-Pfaucet (1-800-732-8238).
1 BEFORE PROCEEDING
1 BEFORE PROCEEDING
1 BEFORE PROCEEDING
1 BEFORE PROCEEDING
1 BEFORE PROCEEDING
1 BEFORE PROCEEDING
WARNING:
Read all the instructions completely before proceeding.
Price Pfi ster recommends calling a professional if you are uncertain about
installing this product!
This product should be installed in accordance with all local and state plumbing
and building codes.
2 SHUT OFF WATER SUPPLY
Locate water supply inlets and shut off the water supply valves. These are
usually found under the sink or near the water meter. If you are replacing an
existing faucet, remove the faucet from the sink and clean the sink surface
thoroughly.
3 TOOLS RECOMMENDED
• PTFE plumber's tape or thread sealant • Plumber's putty
• Slotted screwdriver • Phillips head screwdriver • Pliers
• Adjustable wrench • Flashlight
• Cloth
Your installation may require new supply lines and/or shut-off valves or other
additional tools.
INSTALLATION STEPS
4 SPOUT INSTALLATION
Insert Lift Rod (
4A
) into hole at the back of Spout (
4B
). Place Plastic Seal Ring
(
4C
) against the bottom of Spout Body (
4D
). With Spout (
4E
) facing forward,
4E
4E
carefully install the Lift Rod (
4A
), Shank (
4F
) and receiving Tube (
4F
4F
4G
) through
the center hole of sink (
4H
).
5 SECURING FAUCET
From underneath sink, secure the faucet by placing the Metal Washer
(
5A
) and the Long Sleeve (
5B
) onto the Mounting Post (
5C
). Make sure
that the bumps on the Metal Washer (
5A
) are facing up. Thread Mounting Nut
(
5D
) loosely onto Mounting Post (
5C
). Align faucet, making sure that the Spout
(
5E
) swings equally in both directions. Secure the connection by tightening
5E
5E
Mounting Nut (
5D
) until the faucet is fi rmly connected to the sink.
Do not
over tighten!
6 VALVE BODY INSTALLATION
Rotate Retainer Bracket (
6A
) to a vertical position. Insert Valve Body (
6B
)
through Mounting Holes (
6C
) on the top of fi xture. The HOT valve, labeled with
Red Tag (
6D
), should be positioned to the left side of the Spout (
6E
).
6E
6E
ENGLISH
5C
6A
6B
6C
6C
6D
6E
4C
4E
4D
5A
5B
4G
4F
4H
5C
5A
5B
4A
4B
4A
5E
5E
5D