Rev. 1.00
- 72 -
SRP-275II
5-3-8 Main assy
Part name
Assembly procedure
①
AC timing belt ass’y
(Sub-assembly 5-3-1)
②
AC upper frame caulking ass’y
(Sub-assembly 5-3-2)
③
AC upper cutter guide ass’y
(Sub-assembly 5-3-3)
④
AC motor ass’y
(Sub-assembly 5-3-5)
⑤
Gear-AC worm wheel
⑥
Gear-AC gear pulley -2ea.
⑦
Shaft-AC-shaft guide -2ea.
⑧
Ring-e hole (ø3.0) -2ea.
⑨
Frame-AC lower
⑩
Screw-taptite -5ea.
⑪
Screw-tapping
⑫
Harness-AC
1. Attach
①
AC timing belt ass’y
to two
⑥
Gear-AC gear pulley
and
then insert two
⑥
Gear-AC gear pulley
to two
Shaft-AC-
worm/pulley
of
②
AC upper frame caulking ass’y
.
2. Insert
⑤
Gear-AC worm wheel
to
Shaft-AC-worm/pulley
of
②
AC
upper frame caulking ass’y
.
3. Assemble
③
AC upper cutter guide ass’y
to
①
AC timing belt
ass’y
and then insert two
⑦
Shaft-AC-shaft guide
to
③
AC upper
cutter guide ass’y
and four holes
②
AC upper frame caulking
ass’y
. And assemble two
⑧
Ring-e hole (ø3.0)
.
4. Tighten
④
AC motor ass’y
to
②
AC upper frame caulking ass’y
with
⑩
Screw-taptite
and
⑪
Screw-tapping
.
5. Tighten
⑨
Frame-AC lower
to
②
AC upper frame caulking ass’y
with four
⑩
Screw-taptite
.
6. Insert
⑫
Harness-AC
to the connector of
④
AC motor ass’y
.
2
1
3
4
5
6
6
7
7
8
8
9
10
10
10
10
10
11
12