Rev. 1.00
- 56 -
SRP-275II
5-1-7 Frame basket-A assy
Part name
Assembly procedure
①
Frame basket
②
Roller holder -2ea.
③
Shaft-roller holder
④
Spring-roller holder -2ea.
⑤
Platen paper guide
⑥
Frame-holder basket-L ass’y
(Sub-assembly 5-1-9)
⑦
Frame-holder basket-R ass’y
(Sub-assembly 5-1-11)
⑧
Cutter lower ass’y
(Sub-assembly 5-1-13)
⑨
Screw-taptite (M3×6) -4ea
⑩
Screw-taptite (M3×4) -2ea.
1. Tighten
⑥
Frame-holder basket-L ass’y
to
①
Frame basket
with two
⑨
Screw-taptite (M3×6)
.
2. Tighten
⑦
Frame-holder basket-R ass’y
to
①
Frame basket
with two
⑨
Screw-taptite (M3×6)
.
3. Insert two
②
Roller holder
to
③
Shaft-roller holder
and then
assemble two
④
Spring-roller holder
to
③
Shaft-roller holder
,
⑥
Frame-holder basket-L ass’y
and
⑦
Frame-holder basket-R
ass’y
.
4. Insert
⑤
Platen paper guide
in
①
Frame basket
.
5. Tighten
⑧
Cutter lower ass’y
to
⑥
Frame-holder basket-L
ass’y
and
⑦
Frame-holder basket-R ass’y
with two
⑩
Screw-
taptite (M3×4)
.