Rev. 1.00
- 64 -
SRP-275II
5-2-2 Main-assembly B
Part name
Assembly procedure
①
Gear-RE_A
②
Ribbon-feeder ass’y
(Sub-assembly 5-1-2)
③
Gear-RE_C
Cover HF gear train
④
⑤
Lever-ribbon-feeder ass’y
⑥
Washer-plain (ø2.6) -2ea.
⑦
PCB-head ass’y
⑧
FPC-head
⑨
FPC-30pin
⑩
Screw-taptite (M3×4) -3ea.
Spring
⑪
-lever-tension
⑫
Carriage head ass’y
(Sub-assembly 5-1-5)
Belt
⑬
-round
1. Insert
①
Gear-RE_A
,
②
Ribbon-feeder ass’y
and
③
Gear-RE_C
to three shafts of
Frame-main
.
2. Insert
Cover HF gear train
④
to two shafts.
3. Insert
⑤
Lever-ribbon-feeder ass’y
to two shafts and then
assemble two
⑥
Washer-plain (ø2.6)
.
4. Insert
⑧
FPC-head
,
⑨
FPC-35pin
and the 2pin connector of
Solenoid
to
⑦
PCB-head ass’y
and then tighten two
⑩
Screw-
taptite (M3×4)
.
5. Assemble
Spring
⑪
-lever-tension
between
Lever-tension ass’y
and the hook of
Frame-main
.
6. Insert
⑫
Carriage head ass’y
to
Belt
⑬
-round
and then assemble
Belt-round
between
Pulley
and
Assy-gear-pulley
. And tighten
Lever-tension ass’y
to
Frame-main
with
⑩
Screw-taptite (M3×4)
.
1
2
4
3
5
6
6
7
8
9
10
10
10
11
12
13