10
Figure 3. Assembly diagram
4.4.12. On the rear side of the unit:
4.4.13. Connect the bottle #1 to the inlet connector (#1
–
red
, fig. 3/3) with a tube (fig. 1/6).
4.4.14. Connect the bottle #2 to the inlet connector (#2
–
black
, fig. 3/5) with a tube (fig. 1/6).
4.4.15. Connect the bottle #3 to the inlet connector (#3
–
white
, fig. 3/6) with a tube (fig. 1/6).
4.4.16. Insert the manifold tube (fig. 3/2) into the valve opening (fig. 2/4). Press the valve in
the direction of the arrow and hold the valve while stretching the tube and pulling it
through the opening. Release the valve.
Note:
Make sure that all connections are secured tightly.
4.4.17. Install the protective cover. Ensure that all tubes are covered, but are not squeezed.
4.4.18. Place bottles near the unit.
4.4.19. If 4-channel weight logger is included in the kit, remove pads from underside of scale
cups. Place bottles on the 4-channel weight logger according to the numbering.
Connect the RS-232 with the cable to the plug connector on the rear side of the unit
(fig. 3/7).
4.5.
Switching on
.
Warning!
Before connecting the unit to the mains outlet, check that the power
switch (fig. 3/9) is in position
O
(off).
4.5.1. Connect the external power supply to the power socket (fig. 3/8) on the rear panel of
the unit.
4.5.2. Connect the power cord to the external power supply (fig. 1/16)
4.5.3. Connect the external power supply to the grounded power socket.
4.5.4. Switch on the unit (position
I
) using the power switch on the rear panel.
4.5.5.
When switched on, the unit performs full initialisation cycle and displays the message”
Power on reset”
Note:
Full initialisation cycle takes no longer than 5 seconds.