4.3 Preparing installation levels
1. Screw the bottom adjustment nuts on their
ground anchors and place the washers on the
nuts.
2. The guiding post position will serve as a reference
point for further installation of the other guiding
parts and posts. The bottom adjustment nuts of
the guiding post are levelled as reference towards
the concrete level +25 mm.
The nuts of each guiding position (rear guiding wheels,
rear support roll) should be perfectly horizontal one
between an other, so horizontal and vertical positions
of the main support elements of the gate is realized on
position of the gate during installation.
5. Installation of the gate on the ground anchors
1. The gate is positioned as a whole unit with the guiding post and the rear guiding wheels on
their corresponding ground anchors.
2. Chronological order of actions:
1. Remove packaging from the guiding post. Do not
remove the strap that holds the underbeam and
base plate together.
2. Bring the gate with the guiding post above the
ground anchors at ± 50 cm above the ground.
3. Open the access door of the guiding post. Pull off
the rubber seal
4. Remove the plate under the door by pulling it up
and pushing it towards yourself
5. When the power supply cables or other cables
are coming out of the concrete at the position of
the guiding post, put them trough the hole in the
base plate of the guiding post in to the cabinet.
6. Cut off the straps which fix the rear guiding
wheels to the under beam.
ATTENTION!
Hold the wheels on their place
and prevent them from rolling onwards to the
guiding post as they might bump against a fixation of the induction system.