4.3 Preparing installation levels 

1. Screw the bottom adjustment nuts on their 

ground anchors and place the washers on the 
nuts. 

2.  The guiding post position will serve as a reference 

point for further installation of the other guiding 
parts and posts. The bottom adjustment nuts of 
the guiding post are levelled as reference towards 
the concrete level +25 mm. 

  The nuts of each guiding position (rear guiding wheels, 

rear support roll) should be perfectly horizontal one 
between an other, so horizontal and vertical positions 
of the main support elements of the gate is realized on 
position of the gate during installation. 

5. Installation of the gate on the ground anchors 

1.  The gate is positioned as a whole unit with the guiding post and the rear guiding wheels on 

their corresponding ground anchors. 

2. Chronological order of actions: 

1. Remove packaging from the guiding post. Do not 

remove the strap that holds the underbeam and 
base plate together. 

2. Bring the gate with the guiding post above the 

ground anchors at ± 50 cm above the ground. 

3.  Open the access door of the guiding post. Pull off 

the rubber seal 

4. Remove the plate under the door by pulling it up 

and pushing it towards yourself 

5. When the power supply cables or other cables 

are coming out of the concrete at the position of 
the guiding post, put them trough the hole in the 
base plate of the guiding post in to the cabinet. 

6. Cut off the straps which fix the rear guiding 

wheels to the under beam. 

 

 ATTENTION!

 Hold the wheels on their place 

and prevent them from rolling onwards to the 
guiding post as they might bump against a fixation of the induction system. 

60761BM IM Ind_ENG.indd   9

60761BM IM Ind_ENG.indd   9

08-05-2006   09:11:14

08-05-2006   09:11:14

Содержание Robusta

Страница 1: ...MOTORISED CANTILEVER SLIDING GATES Robusta Bekamatic Industry INSTALLATION MANUAL Ed 60761 April 2006 ENGLISH EN...

Страница 2: ...5 Installation of the gate on the ground anchors 9 6 Installation of the lock post on the ground anchors 10 7 Alignment and levelling of the gate 10 8 Adjustment of the mechanical end stops 13 8 1 Ad...

Страница 3: ...ser manual delivered with the gate The connection to the electrical power supply must be executed by a qualified technician and according laws and standards on electrical installations that are applic...

Страница 4: ...essure resistance 25 N mm2 Minimum 2 flexible ducts minimum 60 mm for electrical cables at the position of the guiding post 1 duct for the connection between the power source and the guiding post of t...

Страница 5: ...Bekamatic Industry ed April 2006 ENGLISH 5 21 3 1 Gates opening to the right...

Страница 6: ...Bekamatic Industry ed April 2006 ENGLISH 6 21 3 2 Gates opening to the left...

Страница 7: ...m 125 mm anchor depth and minimum 100 mm above Finished Ground Level For the connection of Guiding post 4 pieces Lock post 4 pieces Rear guiding roller set 4 pieces Chemical anchors M10 x 200 mm 4 pie...

Страница 8: ...mentioned on the foundations plans provided with the order document 3 Mark the position of the holes with a small diameter concrete drill this will help to centre the final drill 4 Drill the correspon...

Страница 9: ...ioned as a whole unit with the guiding post and the rear guiding wheels on their corresponding ground anchors 2 Chronological order of actions 1 Remove packaging from the guiding post Do not remove th...

Страница 10: ...the tube of the lock post until the connectors are also in the tube This will protect them against water and will facilitate the uninstalling of photocells 3 Put the lock post on the ground anchors an...

Страница 11: ...the base plate WARNING IN ANY CASE DO NOT ADJUST WITH THE M10 NUTS AND BOLTS FOR THE CONNECTION OF THE BASE PLATE AND THE WHEEL SUPPORT 5 After alignment of the lock post and horizontal leveling of t...

Страница 12: ...he support roll as for the perpendicular of the support roll towards the under beam of the wing A support roll installed too high will add undesired friction forces on the wing which are increasing th...

Страница 13: ...n or an obstacle at the rearside of the gate is preventing the wing opening over its full course then adjust according to the description below 1 Remove the lower part of the safety pressure strip fro...

Страница 14: ...trongly advise to respect the dimensions of the foundation plans at all time 1 Remove the rear cover plate from the under beam by unscrewing the 4 screws 2 on both sides of the under beam 2 Close the...

Страница 15: ...clockwise 3 Move the wing slightly back and forward This will prevent pushing a tooth of the dental wheel on top of a tooth of the dental rack instead of gripping in each other 4 When while turning t...

Страница 16: ...OUR POSSIBLE ACCESSORIES IF YOU ARE CONNECTING MORE CONSUMERS TO IT IT MAY BE NECESSARY TO USE A BIGGER SECTION 11 Adjustment and testing safety equipment 11 1 Induction system Check if the jumpers J...

Страница 17: ...up only one pair of photocells is used The receiver is placed in the guiding post and the transmitter is placed in the end post It is mainly sufficient to align the photocells this way that they look...

Страница 18: ...r pair photocell set up three or four pairs of photocells are used This means that always two receivers must be placed in the same post and that both the transmitters must be placed in the opposite po...

Страница 19: ...used as the motor protection The first time a time out occurs E7 will be indicated on the controller display the second time E5 will be indicated When error code E5 is indicated it is necessary to inv...

Страница 20: ...ans that you are in the parameter configuration mode Remark If the procedure was not executed correctly the controller will return to normal display mode Also if you wait too long more than 25s to con...

Страница 21: ...ax NL 0800 022 77 45 info benelux betafence com Betafence Italia Spa C da Salinello 59 I 64018 Tortoreto TE Tel 39 0861 7801 Fax 39 0861 780650 info italy betafence com Betafence Portugal Lda Av Almir...

Отзывы: