10. Power Supply 

1.  Power source must be 240 VAC. Connect the power supply cable 

on to the connectors of the main switch. 

   Cable coming from the main board to the gate, must be secured 

according legislations for electrical installations applicable at that 
time. 

 
   Use a low voltage power solid cable with a section according to the table underneath. (For 

example : NYY JZ 3 x 2,5mm2 according to VDE0276 part 603, VDE 0271 and IEC 52) 

 
  

Section 

(mm

2

) Maximum 

distance 

(m) 

  

2,5 

 

300 

  

 

600 

  

 

900 

 
2. Switch the current on by turning the main switch in position “ON”. 

WARNING: 

THE CALUCULATIONS ARE DONE ON OUR GATE WITH ALL 
OUR POSSIBLE ACCESSORIES. IF YOU ARE CONNECTING 
MORE CONSUMERS TO IT, IT MAY BE NECESSARY TO USE 
A BIGGER SECTION.

 

 

 

11. Adjustment and testing safety equipment: 

11.1 Induction system 

  Check if the jumpers (J1 and J2) for connecting the stationary coil to 

the decoder board are connected. Check if parameter B is set on ‘1’. 

 

 

 

11.2 Safety Strips 

 

Check if all safety strips are functioning correctly. 

  When the safety strip on the top of the wing is activated an “Sc” 

indication must appear on the display of the controller board. 

  An “So” indication must appear when the safety strip at the rear of the 

wing is activated. 

  “So” must be indicated when a safety strips, on the guiding post, in the 

free passage of the gate is activated. 

  “Sc” must be indicated when a safety strips, on the guiding post, at the 

closing side of the gate is activated. 

 

L1

PE

N

Controller Display

60761BM IM Ind_ENG.indd   16

60761BM IM Ind_ENG.indd   16

08-05-2006   09:11:18

08-05-2006   09:11:18

Содержание Robusta

Страница 1: ...MOTORISED CANTILEVER SLIDING GATES Robusta Bekamatic Industry INSTALLATION MANUAL Ed 60761 April 2006 ENGLISH EN...

Страница 2: ...5 Installation of the gate on the ground anchors 9 6 Installation of the lock post on the ground anchors 10 7 Alignment and levelling of the gate 10 8 Adjustment of the mechanical end stops 13 8 1 Ad...

Страница 3: ...ser manual delivered with the gate The connection to the electrical power supply must be executed by a qualified technician and according laws and standards on electrical installations that are applic...

Страница 4: ...essure resistance 25 N mm2 Minimum 2 flexible ducts minimum 60 mm for electrical cables at the position of the guiding post 1 duct for the connection between the power source and the guiding post of t...

Страница 5: ...Bekamatic Industry ed April 2006 ENGLISH 5 21 3 1 Gates opening to the right...

Страница 6: ...Bekamatic Industry ed April 2006 ENGLISH 6 21 3 2 Gates opening to the left...

Страница 7: ...m 125 mm anchor depth and minimum 100 mm above Finished Ground Level For the connection of Guiding post 4 pieces Lock post 4 pieces Rear guiding roller set 4 pieces Chemical anchors M10 x 200 mm 4 pie...

Страница 8: ...mentioned on the foundations plans provided with the order document 3 Mark the position of the holes with a small diameter concrete drill this will help to centre the final drill 4 Drill the correspon...

Страница 9: ...ioned as a whole unit with the guiding post and the rear guiding wheels on their corresponding ground anchors 2 Chronological order of actions 1 Remove packaging from the guiding post Do not remove th...

Страница 10: ...the tube of the lock post until the connectors are also in the tube This will protect them against water and will facilitate the uninstalling of photocells 3 Put the lock post on the ground anchors an...

Страница 11: ...the base plate WARNING IN ANY CASE DO NOT ADJUST WITH THE M10 NUTS AND BOLTS FOR THE CONNECTION OF THE BASE PLATE AND THE WHEEL SUPPORT 5 After alignment of the lock post and horizontal leveling of t...

Страница 12: ...he support roll as for the perpendicular of the support roll towards the under beam of the wing A support roll installed too high will add undesired friction forces on the wing which are increasing th...

Страница 13: ...n or an obstacle at the rearside of the gate is preventing the wing opening over its full course then adjust according to the description below 1 Remove the lower part of the safety pressure strip fro...

Страница 14: ...trongly advise to respect the dimensions of the foundation plans at all time 1 Remove the rear cover plate from the under beam by unscrewing the 4 screws 2 on both sides of the under beam 2 Close the...

Страница 15: ...clockwise 3 Move the wing slightly back and forward This will prevent pushing a tooth of the dental wheel on top of a tooth of the dental rack instead of gripping in each other 4 When while turning t...

Страница 16: ...OUR POSSIBLE ACCESSORIES IF YOU ARE CONNECTING MORE CONSUMERS TO IT IT MAY BE NECESSARY TO USE A BIGGER SECTION 11 Adjustment and testing safety equipment 11 1 Induction system Check if the jumpers J...

Страница 17: ...up only one pair of photocells is used The receiver is placed in the guiding post and the transmitter is placed in the end post It is mainly sufficient to align the photocells this way that they look...

Страница 18: ...r pair photocell set up three or four pairs of photocells are used This means that always two receivers must be placed in the same post and that both the transmitters must be placed in the opposite po...

Страница 19: ...used as the motor protection The first time a time out occurs E7 will be indicated on the controller display the second time E5 will be indicated When error code E5 is indicated it is necessary to inv...

Страница 20: ...ans that you are in the parameter configuration mode Remark If the procedure was not executed correctly the controller will return to normal display mode Also if you wait too long more than 25s to con...

Страница 21: ...ax NL 0800 022 77 45 info benelux betafence com Betafence Italia Spa C da Salinello 59 I 64018 Tortoreto TE Tel 39 0861 7801 Fax 39 0861 780650 info italy betafence com Betafence Portugal Lda Av Almir...

Отзывы: