Bekamatic
®
Industry
ed. April 2006 ENGLISH
7/21
4. Preparations before gate installation
4.1 Required fixation material
Chemical anchors M16 x 250 mm (minimum 125 mm anchor depth and minimum 100 mm
above Finished Ground Level).
For the connection of:
- Guiding post (4 pieces)
- Lock post (4 pieces)
- Rear guiding roller set (4 pieces)
Chemical anchors M10 x 200 mm. 4 pieces for the connection of the support roll for the gate
open position.
WARNING!
DO NOT USE MECHANICAL ANCHORS AS THEY ARE NOT SUITABLE FOR THIS
APPLICATION!
60761BM IM Ind_ENG.indd 7
60761BM IM Ind_ENG.indd 7
08-05-2006 09:11:14
08-05-2006 09:11:14