Bekamatic
®
Industry
ed. April 2006 ENGLISH
10/21
7. Now lower the gate until the rear guiding wheels and the guiding post is resting on
the washers of the ground anchors. Put on each ground anchor a washer and a nut.
Tighten the nuts slightly for temporary fixation. Remove straps from the base plate of
the guiding post.
ATTENTION!
Beware that cables and wires are not crushed between surfaces while lowering
and positioning the gate on the ground anchors.
6. Installation of the lock post on the ground anchors
1. Take off the lock post from the gate wing and bring it
to its ground anchors. Pull out the cables in the lock
post (type YSLY OZ 5 x 0,5 mm2 and connect the
corresponding (numbered) connectors with each other.
ATTENTION!
Do not forget to put the seals (blue)
between the male & female connector for having
waterproof connections.
2. Push back the cables in the tube of the lock post until
the connectors are also in the tube. This will protect
them against water and will facilitate the uninstalling of photocells
3. Put the lock post on the ground anchors and install the upper washers with nuts. Tighten
the nuts slightly for temporary fixation
7. Alignment and levelling of the gate
1. Put the gate in manual mode by turning the threaded
rod anticlockwise until the teeth of the pinion don’t grip
in the teeth of the dental rack anymore.
2. Align the rear guiding wheels, the guiding post
according the gate centre line. Make sure that the wing
is running parallel in the guiding post.
The guiding post and the rear guiding wheels can be
moved laterally in the sleeves of the base plates.
When the alignment between the rear guiding wheels and the guiding post is done tighten
slightly the nuts of the ground anchors of the guiding post and rear guiding wheels.
Check if the gate moves easy by hand over the complete route of the wing during opening and
closing. Do this in slow motion as not all adjustments are done.
60761BM IM Ind_ENG.indd 10
60761BM IM Ind_ENG.indd 10
08-05-2006 09:11:15
08-05-2006 09:11:15