1
ASSEMBLY
See parts breakdown for part identification
MALE HITCH INSTALLATION ON THE
SNOWBLOWER:
Remove the driveline guard (item 1).
Secure the guard extension assembly (item 2) to the
driveline guard with two hex. bolts 1/4" n.c. x
1/2" (item 3) and flange nuts.
Do not tighten.
Secure the guard extension at an angle with one hex.
bolt 1/4" n.c. x 1" (item 4) and two flange nuts (item
5).
NOTE:
Keep a gap of 1/8" (see figure below)
between the bolt head (item 4) and the top flange nut
(item 5).
Tighten securely all bolts and nuts.
Remove the two hex bolts 5/16" n.c. x 1" (item 6),
flange nuts (item 7) and the assembled power take off
support (item 8).
Remove the two 5/16" n.c. x 2 1/4" carriage bolts
(item 9) and nylon insert lock nuts 5/16" (item 10).
Remove the tension bar (item 11).
Remove the four hex bolts 7/16" n.c. x 1 1/4" (item
12) and nylon insert lock nuts 7/16" (item 13).
Remove the male hitch (item 14).
Remove the male hitch
DANGER
All Contact with ROTATING DRIVELINE
can cause death.
KEEP AWAY
DO NOT OPERATE WITHOUT:
-All driveline, tractor & equipment shields in
place.
-Driveline securely attached at both ends.
WARNING
For your security, read the subframe and
snowblower owner's manual for safety
precautions and rules.
Follow the assembly and operation instructions.
P L E A S E F O L L O W T H E S E
INSTRUCTIONS TO INSTALL THIS KIT ON
THE SNOWBLOWER.
Keep a 1/8" gap