10
Receiving and uncrating your compressor
Before uncrating the compressor the following steps should be taken.
1. Immediately upon receipt of the equipment, it should be inspected
for damage that may have occurred during shipment. If any damage
is found, demand an inspection immediately by an inspector from the
carrier. Ask him how to file a claim for damages.
2. Insure that adequate lifting equipment is available for moving the
machinery.
3. Read the compressor nameplate to be sure the compressor is the
model and size ordered.
4. Read the motor nameplate to be sure the motor is compatible with
your electrical conditions. (Volts-Phase-Hertz).
NOTICE
Standard motors are open drip proof with a maximum ambient
temperature rating of 104 degrees F. They are not suitable for salt
laden, corrosive, dirty, wet, or explosive environments.
CAUTION
Improper lifting can result in component or system damage or personal
injury. Follow good shop practices and safety procedures
CAUTION
Under no circumstances should a compressor be placed in an area that
may be exposed to a toxic, volatile or corrosive atmosphere nor should
toxic, volatile or corrosive agents be stored near the compressor.
IMPORTANT:
If voltage supplied to the compressor is below 208 volts
the unit need a 200 Volt drive motor. Motors rated at 208-230-460
Volt should not be used below 208 volts.
receiving
compressor
Содержание 120 GALLON HORIZONTAL
Страница 1: ...User Manual 120 GALLON HORIZONTAL AIR COMPRESSOR BEPOWEREQUIPMENT COM ...
Страница 2: ...2 ...