○ Install the water
treatment unit on a solid base or against the wall (always vertical)
○ Always keep the product upright. If the product is tilted or laid on its side, the electrodes
may not measure correctly.
○ The product must be installed inside. If you want to do it
outside, please contact your
supplier.
○ Do not use the meter with hydrochloric acid (HCl).
○ The electronics (dosing devices) of the unit must be installed inside. Make sure that
- in
case of leakage - water cannot run over the installation.
○ The electronics or the device itself must NEVER be connected to an output of a frequency
converter or frequency inverter.
○ The dosing device must not be on the same power circuit as that of the frequency
converter or frequency converter being used, and it must be at least 3 m from the
dosing unit.
○ Calibrate the pH and Rx electrodes before the first use and "regularly" thereafter. (At least
every 3 months). Verify "regularly" the chlorine content and pH with a color method.
Installation of the water treatment plate
1 Fix the water treatment unit against a solid wall. Fix both the lower and upper part of the
plate.
2 Insert pH and chlorine electrodes into the electrode holders. Fix the nut with pliers or
wrench to tighten the cap. Failure to do so may result in a leak (and is not covered
by warranty).