19
NOTE:
When routing the hydraulic hose through the
columns, make sure to route through the
retaining rings welded inside each column.
Make sure that the hose is clear of any moving
parts. It may be necessary to tie hose clear by
using nylon tie straps or wire.
STEP NINE
( Installing The HYDRAULIC LINES. )
1. Install the Bulkhead Tee fitting into the
powerside post. The through hole is locat-
ed approximately 90 inches from the floor
on the back wall of the powerside post.
2. Connect the power side cylinder hose
to the the tee fitting Be sure to route the
hose through the retainer rings inside the
columns.
3. Route the offside cylinder hose
(crossover hose) up through the post and
across the top trough, down the post and
connect it to the bulkhead tee fitting.
Fig 18
Fig 18
STEP TEN
( Routing The EQUALIZER CABLES )
1. Raise and lock each carriage approximately 28”
above the ground. See Fig. 19
Make sure that the safety locks on
each column are fully engaged before
attempting to route equalizer cables
and/or hoses. Carriages must be
equal height from the floor before
proceeding
.
Fig 19
Содержание XP-10AC
Страница 28: ...28 ...
Страница 33: ...33 ...
Страница 35: ...35 ...
Страница 40: ...40 ...
Страница 41: ...41 ...
Страница 42: ...42 ...
Страница 43: ...43 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...51 ...